![Mendip Stoves Christon 400 3 Sided Frame Operation And Installation Manual Download Page 18](http://html1.mh-extra.com/html/mendip-stoves/christon-400-3-sided-frame/christon-400-3-sided-frame_operation-and-installation-manual_1770730018.webp)
18
HOW TO REMOVE A VERMICULITE BRICK SET
MONTAGE ET DÉMONTAGE DE L’INTÉRIEUR
To remove a vermiculite brick set take the following steps.
Ensure the stove is cold before removing briick set.
Remove ashpan and log retainer ,
To remove log retainer lift out individual bars, then lift out metal support
section
Remove riddling grate, Place hand through ashpan and lift the cast iron
riddling grate up and remove.
Remove lower baffle brick, slide baffle plate forward, then allow rear of
baffle to drop down until baffle is vertical turn baffle and remove from
chamber.
This reveals inner baffle brick above.
Remove inner baffle brick by sliding out inner baffle support brackets on
each side, lower baffle to vertical position turn and remove from
combustion chamber.
Remove base grate. Slide up rear brick 15cm, lift out grate tilting rear
section upwards until front of grate is lifted out of retaining section. Turn
grate sideways and remove from chamber. Lower rear brick down so it
rests on base.