36
Operation and control
loop
t3
t4
t2
t1
on
off
Mo
Tu
We
Th
Fr
Sa
Su
3
4
2
1
STERI
DEFRO
mb
IN 1
IN 2
OUT
MIN
AUTO
MAX
°C
°C
%
rh
h
SETUP
5. Delayed programme start: Switch-on time
Adjustment range:
00.00
to
23.59
(shown in picture: Switch-on time 8:00)
If no switch-on day is selected, then no switch-on time can be selected, and the pro-
gramme starts immediately (
instant start
).
loop
t3
t4
t2
t1
on
off
Mo
Tu
We
Th
Fr
Sa
Su
3
4
2
1
STERI
DEFRO
mb
IN 1
IN 2
OUT
MIN
AUTO
MAX
°C
h
SETUP
Th
Fr
Sa
6. Duration of first ramp segment
Adjustment range:
1
minute to
999
hours (shown in picture: duration 1.00 hour)
loop
t3
t4
t2
t1
on
off
Mo
Tu
We
Th
Fr
Sa
Su
3
4
2
1
STERI
DEFRO
MIN
AUTO
MAX
°C
°C
h
SETUP
TERI
DEFRO
7. Setpoint temperature/temperature to end of ramp segment
Adjustment range
- 42
°C ...
190
°C (shown in picture: Temperature 50 ºC)
loop
t3
t4
t2
t1
on
off
Mo
Tu
We
Th
Fr
Sa
Su
3
4
2
1
DEFRO
MIN
AUTO
MAX
°C
°C
h
SETUP
8. Fan speed in ramp segment
Adjustment range: 10 % ... 100 % (shown in picture: air speed 40 %, 4 bars lit up)
loop
t3
t4
t2
t1
on
off
Mo
Tu
We
Th
Fr
Sa
Su
3
4
2
1
STERI
DEFRO
mb
IN 1
IN 2
OUT
MIN
AUTO
MAX
°C
°C
%
rh
h
SETUP
IN 2
OUT
%
9. Setpoint humidity/humidity at end of ramp segment (only for CTC 256)
Adjustment range:
10
to
90
%rh (shown in picture: humidity 80.0 % rh)