V E N T I L A T I O N & H E A T R E C O V E R Y
INSTALLATION INSTRUCTIONS AND
USER GUIDE
Part no. 744013EN, Week 03/2020 EN
Gateway M-WRG-GW
2
1
3
4
5
6
Fig. 1: Gateway M-WRG-GW
Description
1
Wireless connection LED
2
Network LED
3
Power LED
4
Reset button
5
Power supply connection
6
Ethernet connection
1
Introduction
1.1 Notes on these instructions
These instructions contain important information that
should be followed when installing the M-WRG-GW
gateway.
►
Read all the instructions carefully to avoid possible risks and
mistakes.
►
These instructions are part of the product. Keep the instructions
in a safe place for future reference.
NOTICE
►
When operating the ventilation unit, also follow the operating
instructions that were supplied with your unit.
1.2 Description
The M-WRG-GW gateway is used for cloud-based operation of
ventilation units from the M-WRG-II and M-WRG series constructed
from 2020 onwards (excluding bus unit types) via an iOS or Android
app. The gateway forms the interface between the ventilation unit(s)
and the Meltem app. It can be used to control, program and read
the units decentrally, centrally on site or online from anywhere in the
world. It is used to create time programs for different controllers to
suit the unit configuration. The user can also program various unit
functions and sensors. The app is used to create a personal user
account for configuring and managing the gateway. Communication
between the gateway and ventilation units is also established and
controlled via the app. Data protection has top priority; the data is
fully encrypted and can only be released by the user. Up to 20 units
may be logged into a gateway; the number is only limited by the
wireless range.
The following components are needed to control the ventilation units
using the app:
— Ventilation units from the M-WRG-II and M-WRG series
constructed from 2020 onwards (excluding bus unit types)
— Smartphone or tablet, iOS or Android operating system
— Meltem app
— M-WRG-GW gateway with Meltem cable and mains adapter
— Router with Internet access (provided by the customer)
The gateway can also be used in parallel with the M-WRG-FBH
wireless remote control, M-WRG-FT 4-way wireless pushbutton
switch, M-WRG-II FSF wireless humidity sensor and M-WRG-II FSC
wireless CO
2
sensor and in conjunction with the U
2
installation
version and all M-WRG-II and M-WRG covers.
1.3 Target group
These instructions are intended for users of the M-WRG-GW
gateway. No special prior knowledge is needed.
1.4 EU declaration of conformity
The gateway described below
Type: M-WRG-GW
Part number: 5453-00
manufactured by
Meltem Wärmerückgewinnung GmbH & Co. KG
Am Hartholz 4
D-82239 Alling
conforms to the regulations and standards listed in the EU Declara-
tion of Conformity.
1.5 Technical data
Product characteristics
Dimensions (W x H x D)
105 mm x 80 mm x 25 mm
Weight
approx. 90 g
Colour
white, similar to RAL 9010
Material of the plastic parts
ABS
Ambient conditions
Ambient temperature during
operation
0 °C to 50 °C
Ambient temperature for storage
and shipping
-25 °C to 60 °C
Relative humidity
5 % to 90 %,
non-condensing
Power supply
Plug-in mains adapter including
cable with micro USB-B connector
230 V AC to 5 V DC,
max. 500 mA
Communication
Communication frequency
868.3 MHz, Rx class 2,
minimum output power 0 dBm
Ethernet
10/100 Mbit
Connections
Ethernet
RJ45 jack
5 V DC power supply
Micro USB-B jack, max.
current consumption 200 mA
1.6 Environmentally-friendly disposal
The components of the M-WRG-GW gateway must not be
disposed of in the residual waste bin.
►
In Germany, metal and plastic components should be disposed
of at the local recycling centre. The national regulations in other
EU states should also be followed.
►
In Germany, electrical components should be disposed of in
accordance with the Electrical and Electronic Equipment Act
(ElektroG). In other EU states, the national implementation of the
Waste Electrical and Electronic Equipment Directive 2012/19/EU
(WEEE) should be followed.
► The regulations and statutory requirements in your own country
concerning disposal should also be followed.
1.7 Explanation of the symbols used
►
This symbol indicates an action to be taken.
— This symbol indicates a list.