Installation manual
M-WRG-II M-U
2
- 38 -
Meltem Wärmerückgewinnung GmbH & Co. KG
Am Hartholz 4 · D-82239 Alling
[email protected] · www.meltem.com
VENTILATION THE RIGHT WAY
V E N T I L A T I O N & H E A T R E C O V E R Y
8.20
Sealing ventilation pipes on external wall
NOTICE
If the external plaster encloses the ventilation pipes all round and without gaps, you can
skip the steps described in this section.
►
Chamfer both pipe breakthrough
edges (item 1 in Fig. 42) to roughly
5x45° to create enough space for the
sealing joints with permanently elastic
sealant.
►
Fill the chamfers of the pipe break-
through edges all-round with perma-
nently elastic sealant on the outside.
NOTICE
Only use a solvent-free sealant if the
sealant is applied to polystyrene.
8.21
Attaching the outer wall terminal
WARNING
Do not run without the outer wall terminal.
►
Please note that the ventilation unit must not be used without the outer wall terminal
for safety reasons.
►
Attach the outer wall terminal to the
external wall.
Installation of the outer wall terminal
is described in a separate installation
manual (see “1.8 Supplementary docu
Fig. 42: Sealing ventilation pipes on external wall
1
Fig. 43: Attaching the outer wall terminal