background image

Configuring the Switch

Rev 1.4

Mellanox Technologies

22

The following is an example of the output:

2.2

Rerunning the Wizard

If you want to rerun the wizard run the following commands:

Interface mgmt0 state

   Admin up:           yes

   Link up:            yes

   IP address:         192.168.10.43

   Netmask:            255.255.255.0

   Speed:              1000Mb/s (auto)

   Duplex:             full (auto)

   Interface type:     ethernet

   Interface source:   physical

   MTU:                1500

   HW address:         00:02:C9:11:2A:AE

   Comment:

 

RX bytes:

1343502058

 TX bytes:

 313920869

RX packets:        17589211            TX packets:     992717

RX mcast packets:  0 

TX discards:

0

RX discards:       0                   TX errors:      0

RX errors:         0                   TX overruns:    0

RX overruns:       0                   TX carrier:     0

RX frame:          0                   TX collisions:  0

                                          TX queue len:   1000

sx-43 [standalone: master] > enable

sx-43 [standalone: master]# configure terminal 

sx-43 [standalone: master]# configuration jump-start

Summary of Contents for switchx MSX1035B-1BRR

Page 1: ...www mellanox com SwitchX 36 Port QSFP Ethernet Switch Installation Guide P N MSX1035B 1BRR MSX1035B 1SFR MSX1036B 1BRR MSX1036B 1SFR Rev 1 4...

Page 2: ...ND AND SOLELY FOR THE PURPOSE OF AIDING THE CUSTOMER IN TESTING APPLICATIONS THAT USE THE PRODUCTS IN DESIGNATED SOLUTIONS THE CUSTOMER S MANUFACTURING TEST ENVIRONMENT HAS NOT MET THE STANDARDS SET B...

Page 3: ...8 1 2 2 Mechanical Installation 9 1 3 Package Contents and Installation 9 1 3 1 Installing the Switch in the Rack 9 1 3 2 Grounding the Switch 14 1 3 3 Power Connections and Initial Power On 15 Chapte...

Page 4: ...the Rail 12 Figure 5 Inserting the Caged Nuts 13 Figure 6 Slide the Rail into the Rail Slide 13 Figure 7 Status LEDs 5 Minutes After Power On 14 Figure 8 Two Power Inlets Electric Caution Notificatio...

Page 5: ...this Installation Guide Revision Date Details 1 4 August 2012 Converted Visio graphics to Mechanical drawings Added figure 2 1 3 January 2012 Added SX1016 Switches 1 2 January 2012 Fixed wizards Adde...

Page 6: ...scussing memory sizes MB and MBytes are used in this document to mean size in mega bytes The use of Mb or Mbits small b indicates size in mega bits Table 2 Reference Documents Document Name Descriptio...

Page 7: ...potentially cause personal injury or damage to hardware or software Mellanox Part Numbering Legend Place Field Decoder M Mellanox Technologies SX System Type SwitchX Switch P Protocol 10 Ethernet MM P...

Page 8: ...ure that the switch air flow direction is compatible with your system rack and PSUs The connector side of the switch has theQSFP ports system LEDs and management con nection ports The switch platform...

Page 9: ...parts have been sent check this against the parts list below Check the parts for visible damage that may have occurred during shipping The switch comes packed with the following items 1 X switch 1 X...

Page 10: ...l be working and put on the ESD strap Make sure the ESD strap is touching your skin and that the other end is connected to a verified ground 2 Choose which side of the switch you want even with the ra...

Page 11: ...as 3618 cables connected to the switch Do you want the connector side recessed in the rack to allow for a larger cable bending radius It is possible to recess the connector side by 5cm by optional pla...

Page 12: ...t switches and 7 screws for standard depth switches to connect each switch slide Figure 4 Screwing on the Rail To use the rail kit to transfer the power cord from the connector side to the power side...

Page 13: ...d nuts into the holes on the opposite side of the rack Check that both sides of the switch left and right are the same level in the rack 7 Slide the rail into the rail slide 8 Using two of the bolts f...

Page 14: ...ecting all of the cables to the switch 1 3 2 Grounding the Switch Check to determine if your local or national electrical codes require an external ground to all IT components If so connect a ground w...

Page 15: ...or local codes may require IT components to be bonded and exter nally grounded not including the power cord ground You must follow all national and local codes when installing this equipment Caution...

Page 16: ...indepen dent Disconnect all power supplies to ensure a powered down state inside of the switch platform ACHTUNG Gafahr des elektrischen Schocks Entferrnen des Netzsteckers elnes Netzteils spannungsfr...

Page 17: ...J 45 port of the switch system using the supplied cable The Console ports for SX10XX systems are shown below as examples Figure 9 Console Port Step 2 Configure a serial terminal program for example Hy...

Page 18: ...hostname then press Enter Otherwise type a different hostname and press Enter Step 2 Use DHCP on mgmt0 interface no Perform this step to obtain an IP address for the switch eth0 is the management port...

Page 19: ...e no 5 Admin password Enter to leave unchanged CHANGED To change an answer enter the step number to return to Otherwise hit enter to save changes and exit Choice Enter Configuration changes saved To r...

Page 20: ...nfig SLAAC on mgmt0 interface no no Step 9 Admin password Enter to leave unchanged Step 9 Confirm admin password Enter to leave unchanged You have entered the following information 1 Hostname switch 1...

Page 21: ...0 0 0 255 255 255 0 Step 6 Default gateway for example 192 168 10 1 Step 7 Primary DNS server Step 8 Domain name Step 9 Enable IPv6 yes yes Step 10 Enable IPv6 autoconfig SLAAC on mgmt0 interface no...

Page 22: ...000Mb s auto Duplex full auto Interface type ethernet Interface source physical MTU 1500 HW address 00 02 C9 11 2A AE Comment RX bytes 1343502058 TX bytes 313920869 RX packets 17589211 TX packets 9927...

Page 23: ...itch using the following command using switch_IP_address is the IP address of the switch Step 4 You can enter any supported command now 3 2 Resetting the Switch On the connector side panel under the s...

Page 24: ...up when the button is pushed A quick push of this button performs this reset When the button is held down for 15 sec onds the switch is reset and the password is deleted You will then be able to ente...

Page 25: ...s on both sides of the switch or only one side For each power cord you want to transfer 1 Once you have decided which side of the switch will be next to the vertical support 2 Make sure that you place...

Page 26: ...Connecting to the Switch Platform Rev 1 4 Mellanox Technologies 26 Figure 12 Install the Switch Slide Figure 13 Transfer Power Cord Finished 5 Return to step 4 on page 12 and continue the installation...

Page 27: ...Module Select 9 ResetL Module Reset 10 Vcc Rx 3 3 V Power supply receiver 11 SCL 2 wire serial interface clock 12 SDA 2 wire serial interface data 13 GND Ground 14 Rx3p Receiver Non Inverted Data Out...

Page 28: ...3 3 3 3 3 3 RX4p GND GND GND RX4n RX2p RX2n TX1n GND TX1p GND TX3n TX3p GND IntL ModPrsL VccTx Vcc1 LPMode 18 35 8 50 Top ResetL SDA SCL ModSelL RX3p TX2n GND VccRx 1 2 3 4 5 6 7 8 9 1 0 1 2 3 4 5 6...

Page 29: ...568A standard wiring color coding T X D T X D R X D G N D G N D R X D G N D G N D R J45_R T S R J45_D T R R J45_T X D G N D G N D R J45_R X D G N D G N D J34 P in 1 P in 8 Loo king into the S ocket C...

Page 30: ...w Connector side to Power Supply side air flow MSX60 PR Power cord Type C13 C14 ACC000251 Power cord Type B for USA Canada Mexico Taiwan ACC000204 Power cord Type H for Israel ACC000205 Power cord Ty...

Reviews: