Installation
65
Mellanox Technologies
2.7.3.1 Extracting a Spine Module
Extracting Spine Module #1 or #2
Spine module #1 is connected to management module #1 and spine module #2 is connected to
management module #2.
Figure 50: Management Module Numbering
MNG2
Mgmt module
MNG1
Mgmt module
If you need to hot swap spine #1 or spine #2:
Step 1.
Make sure that two management modules are connected to the switch system. See
When a slave management module is not installed or not working, hot-swapping the
spine module connected to the master management module will cause the chassis to
crash.
Neither the CLI nor the GUI management tools will allow you to shut down spine #1
or spine #2, as the management modules are connected to the chassis components
through these spines.
Removing spine #1 causes management module #1 to reset.
Removing spine #2 causes management module #2 to reset.
Warning
: If the spine you want to hot swap is connected to the master management
module the management module will
reboot
when you take out the spine.
Do not extract spine 1 or 2 if only one management module is connected!
Doing so
will cause the switch system to hang which will lead to traffic loss.
Summary of Contents for Switch-IB
Page 2: ...Doc MLNX 15 4748 324 2 Mellanox Technologies...
Page 103: ...104 Mellanox Technologies Figure 77 InfiniBand QSFP Connector Symbol...
Page 104: ...105 Mellanox Technologies Figure 78 QSFP Connector Male and Female Views...
Page 111: ...112 Mellanox Technologies 6 7 8 9 10 11...
Page 112: ...113 Mellanox Technologies 12 13 14 15 16 17...
Page 113: ...114 Mellanox Technologies 18 19 20 21 WEEE 22 H 4 Chinese 1...
Page 114: ...115 Mellanox Technologies 2 3 4 5 6 7 8 r r 368...
Page 115: ...116 Mellanox Technologies 9 10 InfiniBand 11 12 13 14 15 UL CSA 16 QILQL DQG 8 6 9 5 9 39 9...
Page 116: ...117 Mellanox Technologies 17 18 19 20 WEEE 21 56 8 3 3 36 71 7...
Page 127: ...128 Mellanox Technologies 3 4 5 6 7 8 9 45 C 113 F 8 3...
Page 144: ...145 Mellanox Technologies 5 6 7 8 9 10 11 FP 368...