2.2

Mechanical Installation

These switches are hot pluggable. It is not necessary to power down the Dell Chassis to install a 
new switch or to replace an old switch with a new one. 

Figure 4: Rear View of the Dell PowerEdge M1000e Chassis 

Note: M3601Q blades are not allowed in the Fabric A slots.

The M3601Q IOM occupies both Fabric B and Fabric C slots and connects to the Fabric C mid-
plane. The ConnectX Mezzanine I/O card must be installed in the Fabric C location on the server 
blade to support data flow. This does NOT apply to DDR, since the switch is installed in a single 
slot and connected to a its corresponding fabric the ConnectX Mezzanine I/O card must be installed 
in the corresponding fabric. You must install a module in slots B1/C1 before installing a module in 
slots B2/C2. 

2.2.1

Removing an Old Switch From the Chassis

1. Remove any locking cables or screws that secure the old switch into the chassis.

2. Disconnect all of the InfiniBand cables from the front of the switch to be removed. 

3. Unlock the switch from the chassis by pushing the red latch release button.

4. Pull the locking arm down to a position perpendicular to the front of the chassis.

5. Pull the switch out of the chassis using the locking arm.

• Install either a new switch or an I/O Module Blank within one minute.

Latch Release Buttons

Locking Arms

Channel 2 slots

 

    C2 B2 A2

Channel 1 slots

 

     A1 B1 C1

Summary of Contents for InfiniScale IV M3601Q

Page 1: ...anox Technologies Third party information brought to you courtesy of Dell InfiniScale IV 16 16 Port 40Gb s InfiniBand Switch for Dell PowerEdge M1000e series Blade Enclosures User Manual PN M3601Q Rev...

Page 2: ...U S A www Mellanox com Tel 408 970 3400 Fax 408 970 3403 Mellanox Technologies Ltd PO Box 586 Hermon Building Yokneam 20692 Israel Tel 972 4 909 7200 Fax 972 4 959 3245 NOTE THIS INFORMATION IS PROVID...

Page 3: ...Module Blank From the Chassis 12 2 2 3 Installing the Mellanox M3601Q Switch Into the Dell Chassis 12 2 3 Power Connections and Initial Power On 12 2 4 InfiniBand Cable Installation 12 Chapter 3 Clust...

Page 4: ...ces Mellanox Technologies Web pages http www mellanox com Dell Support Web pages http support dell com Conventions Throughout this manual the name M3601Q and the terms switch I O module and IOM are us...

Page 5: ...Port 40Gb s InfiniBand Switch User Manual MellanoxTechnologies Rev 1 1 5 Revision History Table 2 Revision History Table Date Revision Description March 2009 1 1 Added Dell Logo November 2008 1 0 Ini...

Page 6: ...comes pre installed with all necessary firmware and configured for standard oper ation within an InfiniBand fabric and requires an InfiniBand compliant Subnet Manager running from one of the hosts Al...

Page 7: ...a valid physical connection to the other system switch or HCA port exists The yel low LED when lit indicates that the Subnet Manager is running and a valid data link exists The yellow LED illuminates...

Page 8: ...G BLUE The CMC is identifying the newly installed switch ON ON BLUE Switch is on and operating Normally ON ON or BLINKING AMBER Fault in System Self diagnosed OFF ON or BLINKING AMBER Fault in System...

Page 9: ...fore carrying on with installation procedures 2 1 Installation Safety Warnings 1 Installation Instructions 2 Over temperature 3 Stacking the Chassis 4 During Lightning Electrical Hazard Suitable elect...

Page 10: ...connectors Refer to the cable manufacturer for special warnings and instructions When this product is mounted or serviced in a rack special precautions must be taken to ensure that the system remains...

Page 11: ...gle slot and connected to a its corresponding fabric the ConnectX Mezzanine I O card must be installed in the corresponding fabric You must install a module in slots B1 C1 before installing a module i...

Page 12: ...inst the bar 5 Push the lever on the latching mechanism up making sure that the latching mechanism catches the locking bar The lever should now be parallel to the front panel 6 Check the indicator lig...

Page 13: ...port receptacle Both LED indicators will turn off when the cable is unseated Care should be taken not to impede the air exhaust flow through the chassis Note Cable lengths should be used which allow...

Page 14: ...ble in MLNX_OFED to update firm ware for this switch It also can be downloaded from http www mellanox com Downloads Firmware Tools The latest firmware can be found at http www mellanox com Support Del...

Page 15: ...eck I 32 I skip option set no report will be issued I I Bad Links Info I I No bad link were found I Stages Status Report STAGE Errors Warnings Bad GUIDs LIDs Check 0 0 Link State Active Check 0 0 Perf...

Page 16: ...mlxburn with the LID retrieved in step 3 above to perform the In Band burning operation Burn the InfiniScale IV switch root mymach mlxburn d dev mst SW_MT48438_lid 0x0003 fw fw IS4 mlx qq I Querying...

Page 17: ...for the InfiniBand connector does not come on 1 Check that both ends of the cable are connected 2 Check that the locks on the ends are secured 3 Make sure that the latest FW version is installed on b...

Page 18: ...y Compliance InfiniBand QoS Management Auto Negotiation of 10Gb s 20Gb s or 40 Gb s 9 InfiniBand Virtual Lanes for all ports 8 Data transport lanes and 1 management lane Baseboard Performance and Devi...

Page 19: ...This equip ment generates uses and can radiate radio frequency energy and if not installed and used in accor dance with the instruction manual may cause harmful interference to radio communications Op...

Page 20: ...ation of Information and Communication Equipment requires EMC test ing and certification for many electronic products Korean EMC certifications are issued by Radio Research Laboratory RRL which is org...

Page 21: ...L Module Reset 10 Vcc Rx 3 3 V Power supply receiver 11 SCL 2 wire serial interface clock 12 SDA 2 wire serial interface data 13 GND Ground 14 Rx3p Receiver Non Inverted Data Output 15 Rx3n Receiver I...

Page 22: ...4 5 6 7 8 9 2 2 2 2 2 2 2 2 2 1 2 3 4 5 6 7 8 3 3 3 3 3 3 3 3 RX4p GND GND GND RX4n RX2p RX2n TX1n GND TX1p GND TX3n TX3p GND IntL ModPrsL VccTx Vcc1 LPMode 18 35 8 50 Top ResetL SDA SCL ModSelL RX3p...

Page 23: ...tour des ouver tures de ventilation Le ch ssis ne doit pas tre empil sur un autre mat riel Si le ch ssis tombe il peut pro voquer des blessures corporelles et des d gradations de biens Pendant un orag...

Page 24: ...24 8 Elimination du mat riel 9 Codes lectriques locaux et nationaux L limination de ce mat riel doit s effectuer dans le respect de toutes les l gislations et r glementations nationales en vigueur Ce...

Page 25: ...w hrleisten Das Chassis sollte nicht auf andere Ger te gestapelt werden Wenn das Chassis herunt erf llt kann es zu Verletzungen und Besch digungen an Ger ten f hren Arbeiten Sie w hrend eines Gewitter...

Page 26: ...26 8 Ger teentsorgung 9 Regionale und nationale elektrische Bestimmungen Die Entsorgung dieses Ger ts sollte unter Beachtung aller nationalen Gesetze Bestim mungen erfolgen Dieses Ger t sollte unter B...

Reviews: