2

Installation and Basic Operation

Installation and initialization of the switch platform are straightforward processes, requiring atten-
tion to the normal mechanical, power, and thermal precautions for rack-mounted equipment. The 
switch platform does not require any programming or configuration to operate as a basic Infini-
Band switch and includes all of the necessary functionality to operate with external standard Infini-
Band Subnet Management software. 

This section describes the installation process and basic operation of the switch platform. Please 
first read the warnings sub-section carefully before carrying on with installation procedures.

Suitable electrical, mechanical and fire enclosure shall be provided by the end user.

Summary of Contents for InfiniScale III M2401G 20Gb/s InfiniBand

Page 1: ...Mellanox Technologies Third party information brought to you courtesy of Dell InfiniScale III M2401G 20Gb s InfiniBand Blade Switch I O Module for PowerEdge M Series User Manual PN M2401G Rev 1 8...

Page 2: ...nyvale CA 94086 U S A www Mellanox com Tel 408 970 3400 Fax 408 970 3403 Mellanox Technologies Ltd PO Box 586 Hermon Building Yokneam 20692 Israel Tel 972 4 909 7200 Fax 972 4 959 3245 NOTE THIS INFOR...

Page 3: ...e Chassis 12 2 2 3 Installing the Mellanox M2401G Switch Into the Dell Chassis 12 2 3 Power Connections and Initial Power On 12 2 4 InfiniBand Cable Installation 13 Chapter 3 Cluster Management and Fi...

Page 4: ...2401G and the term switch are used to describe the M2401G 20Gb s InfiniBand blade switch I O module unless explicitly indicated otherwise Table 1 Reference Documents InfiniBand Architecture Specificat...

Page 5: ...Dec 2008 Rev 1 6 Minor fixes to Rev 1 5 Dec 2008 Rev 1 5 Minor fixes to Rev 1 4 Added Instructions for Reprogramming Over the InfiniBand Network Nov 2008 Rev 1 4 Added Dell logo and Dell 3rd party inf...

Page 6: ...niBand fabric and requires an InfiniBand compliant Subnet Manager run ning from one of the hosts All that is required for normal operation is to follow the usual precau tions for installation and conn...

Page 7: ...ansfer is designated by a constant yellow LED indication A valid data activity link with data transfer is designated by a blinking yellow LED indication If the LEDs are not active either the physical...

Page 8: ...Green Status OFF OFF OFF ON OFF Boot in Progress Switch not ready Blinking Blue ON BLINKING BLUE The CMC is identifying the newly installed switch ON ON BLUE Switch is on and operating Normally ON ON...

Page 9: ...ent The switch platform does not require any programming or configuration to operate as a basic Infini Band switch and includes all of the necessary functionality to operate with external standard Inf...

Page 10: ...ound the ventilation openings The chassis should not be stacked on any other equipment If the chassis falls it can cause bodily injury and equipment damage During periods of lightning activity do not...

Page 11: ...l PowerEdge M1000e Chassis Note M2401G blades are not allowed in the Fabric A slots 2 2 1 Removing an Old Switch From the Chassis 1 Remove any locking cables or screws that secure the old switch into...

Page 12: ...ll a module in slot C1 before installing a module in slot C2 Modules may be installed in Fabric B and C independently you do not need to install modules in Fabric B before installing modules in Fabric...

Page 13: ...connector After plugging in a cable lock the connector using the latching mechanism particular to the cable vendor The yellow LED will light if the subnet manager is running non blinking indicating t...

Page 14: ...ools package available in MLNX_OFED to update firm ware for this switch It also can be downloaded from http www mellanox com Downloads Firmware Tools The latest firmware can be found at http www mella...

Page 15: ...l hosts list I I skip option set no report will be issued I I IPoIB Subnets Check I 32 I skip option set no report will be issued I I Bad Links Info I I No bad link were found I Stages Status Report S...

Page 16: ...e to perform the In Band burning operation Burn the InfiniScale III switch root mymach mlxburn dev dev mst SW_MT47396_lid 0x0011 fw IS3FW BIN I Reading PSID from board I Using auto detected configurat...

Page 17: ...to blink replace the switch The link LED for the InfiniBand connector does not come on 1 Check that both ends of the cable are connected 2 Check that the locks on the ends are secured 3 Make sure that...

Page 18: ...Management Auto Negotiation of 10Gb s or 20Gb s 8 InfiniBand Virtual Lanes for all ports Baseboard Performance and Device man agement Agents for full InfiniBand In Band Management Safety EMC ENVIRONM...

Page 19: ...M2401G 20Gb s InfiniBand Blade Switch I O Module User Manual MellanoxTechnologies Rev 1 8 19 Appendix B Mechanical Drawing Figure 4 Mechanical Drawing of the Switch...

Page 20: ...commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to ra...

Page 21: ...a s Regulation for Certification of Information and Communication Equipment requires EMC testing and certification for many electronic products Korean EMC certifications are issued by Radio Research L...

Page 22: ...P S4 IBtxIn 1 IB_Px_R2_N S5 IBtxIp 2 IB_Px_R3_P S6 IBtxIn 2 IB_Px_R3_N S7 IBtxIp 3 IB_Px_R4_P S8 IBtxIn 3 IB_Px_R4_N S9 IBtxOn 3 IB_Px_T4_N S10 IBtxOp 3 IB_Px_T4_P S11 IBtxOn 2 IB_Px_T3_N IBtxIp 0 IBt...

Page 23: ...xternal ports Figure 6 Pinout Connector View S12 IBtxOp 2 IB_Px_T3_P S13 IBtxOn 1 IB_Px_T2_N S14 IBtxOp 1 IB_Px_T2_P S15 IBtxOn 0 IB_Px_T1_N S16 IBtxOp 0 IB_Px_T1_P G1 G6 G9 H1 H2 Signal Ground G7 Sen...

Page 24: ...tour des ouver tures de ventilation Le ch ssis ne doit pas tre empil sur un autre mat riel Si le ch ssis tombe il peut pro voquer des blessures corporelles et des d gradations de biens Pendant un orag...

Page 25: ...1 8 25 8 Elimination du mat riel 9 Codes lectriques locaux et nationaux L limination de ce mat riel doit s effectuer dans le respect de toutes les l gislations et r glementations nationales en vigueur...

Page 26: ...w hrleisten Das Chassis sollte nicht auf andere Ger te gestapelt werden Wenn das Chassis herunt erf llt kann es zu Verletzungen und Besch digungen an Ger ten f hren Arbeiten Sie w hrend eines Gewitter...

Page 27: ...8 27 8 Ger teentsorgung 9 Regionale und nationale elektrische Bestimmungen Die Entsorgung dieses Ger ts sollte unter Beachtung aller nationalen Gesetze Bestim mungen erfolgen Dieses Ger t sollte unte...