2
Pay Attention!
• All servers and systems in the rack should be planned with the airflow
direction. All FRU components must have the same
air flow direction
. A
mismatch in the air flow will affect the heat dissipation.
Package Contents
• 1 x rail kit (including an air-duct unit)
• Quick Start Guide
If anything is damaged or missing, contact your Mellanox representa-
tive at [email protected].
1X
*Choose one nut type, according to the rack you are installing the system in
(square or round holes).
A
8X*
8X*
B
8X
C
8X
D
12X
E
1X
G
2X
F
2X
Summary of Contents for 1G Switch Air Duct Rail Kit
Page 3: ...3 1 2...
Page 4: ...4 3 4...
Page 5: ...5 5 6...
Page 6: ...6 7 8...
Page 7: ...7 9 10...
Page 8: ...8 11 12...
Page 11: ...11...
Page 12: ......