Melink Corporation (513) 965-7300 www.melinkcorp.com
17
Install Air Purge Units
6
Remove the lids from each APU box to
prepare for step 7.
Plug the Optic Cables into any receptacle on the header board inside each APU. Then
run a cable from APU box to APU box.
Attach an APU to each Purge Pipe and
tighten the compression fitting.
A
Attach APU to Purge Pipe
Remove APU lids
B
Optic Cables
Plug In Optic Cables
C
MELINK
Intelli-Hood
Controls
®
®