
FOCKE MELER GLUING SOLUTIONS
5-8
MELTER OPERATION
Click on the tab to activate it.
The system begins the injection cycle following the parameters esthablised
(Injection time, Waiting time).
During melting block, the melted adhesive falls to the down tank. Once the
adhesive reached to the level detector, the fuser grid is disconnected and the
pneumatic cylinder stops to press. When the adhesive is consumed, the level
begins to go down. When the sensor stops to detect adhesive, the fuser grid
and the boost pressure is activated again.
When the block is consumed the main screen shows the empty drum signal
(colour white in the tower light). To change the block lift the lid. The system is
depressurized automatically.
Summary of Contents for PS20
Page 18: ...FOCKE MELER GLUING SOLUTIONS 2 8 INTRODUCTION This page is intentionally left blank ...
Page 30: ...FOCKE MELER GLUING SOLUTIONS INSTALLATION 3 12 This page is intentionally left blank ...
Page 56: ...FOCKE MELER GLUING SOLUTIONS 4 26 NAVEGATION SUR L ECRAN TACTILE Cette page n a pas de texte ...
Page 82: ...FOCKE MELER GLUING SOLUTIONS 8 2 ELECTRICAL DRAWINGS This page is intentionally left blank ...
Page 86: ...FOCKE MELER GLUING SOLUTIONS 9 4 PNEUMATIC DRAWING This page is intentionally left blank ...
Page 88: ...FOCKE MELER GLUING SOLUTIONS 10 2 SPARE PARTS LIST This page is intentionally left blank ...
Page 96: ...FOCKE MELER GLUING SOLUTIONS 10 10 SPARE PARTS LIST 3 27 1 2 21 6 10 9 4 7 5 20 22 ...