SECTION 6 - INITIAL BREAK-IN MAINTENANCE
GENERAL MAINTENANCE
Perform the following maintenance checks after the initial break in period.
1. Check Bolts and Nuts for looseness. Tighten it if necessary.
2. Check for fuel and oil leak.
3. Keep the RUBBER BUFFER away from oil and fuel.
4. Check the V-Belt for wear, damage and cracks. If necessary, replace the belt with new one.
5. Please refer to “Owners Manual” for
Robin EH09-2D
engine for KP-30 and KP-50 regarding engine maintenance.
6-2
Summary of Contents for KP30A
Page 5: ......
Page 7: ......
Page 33: ...SECTION 16 SCHEMATICS NOTE No Schematics are necessary for this unit 16 1 16 2...
Page 34: ......
Page 35: ......