BDIR – Technician Settings
Meitav-tec Ltd (Contel group)
Tel: +972 (3) 962 6462 Fax: +972 (3) 962 6620
www.meitavtec.com - [email protected]
It is recommended to mount the thermostat between 1.5 & 1.8
meters from the floor where possible.
Separate the base from the cover by pressing the tongue (pic.1).
Gently disconnect the quick connector between cover and base
(pic.2)
Line the back panel up against the wall and drill the appropriate
fixing holes (pic.3).
Insert screws so they extend approx. 3/16" (3 mm) from the wall.
Align the back panel against these screws, pushing it forward,
allowing it to slide downwards to lock into position.
Make electrical connections to terminals on the back panel. Refer
to the “Wiring Connections” section.
Reconnect the quick connector.
Change the JUMPERS position according to the system
configuration. Refer to the “Jumper Configuration” section.
Attach the cover to the base, first the two shafts and then the
spring.
Connect 24Vac to the thermostat; verify that LCD display is ON.
Do not install battery before power is applied.
Remove battery from back panel by sliding it to the left and out from
its white retaining clip and mount it in black holder on front panel;
insert it from the top, gently pressing downwards until it snaps into
place and is held under the top clip of the holder.
The '+' engraved on battery should be visible (pic. 4).
Be careful - the top clip of the battery holder is fragile.
Reassemble front and back cover.
Connect at top first then at bottom.
Installation Instructions
Pic.3
Battery Holder
Back panel
Front panel
+
Pic.4
Quick connector
Shafts
Pic.2
Spring tongue
Spring tongue
Pic.1
Wiring Connections
Terminal
Function
HC11 HC22 HC32
HP22 HP32
T0,T0
T1,T1
AUX
Y1
Y2
W1
W2
W3
G1
G2
AL,AL
Rc
Rh
C
14,15,16
Not in use
External sensor (option)
Not in use
Compressor 1
Compressor 2
Heat Element 1 / Heat Pump
Heat Element 2
Heat Element 3
Fan
Not in use
Not in use
24Vac Phase (red)
24Vac (jumpered to
Rc
terminal)
24Vac Common
Another IR Receiver (option)
-
-
+
-
H.E 1
-
-
+
-
-
+
+
+
-
-
+
+
H.E 1
+
-
+
-
-
+
+
+
-
-
+
+
H.E 1
+
+
+
-
-
+
+
+
-
-
+
H.P
-
+
-
-
+
+
+
-
-
+
+
H.P
+
-
-
+
+
+
OPT
-
Not
in use
+
Connect
Heat
element 1
H.E 1
Heat
Pump
H.P
Option
OPT
Jumpers Configuration
Disconnect power,
remove battery and
wait 5 minutes* before
changing the jumpers
position.
*No need to wait if the
unit wasn’t connected
to power (1
st
Install).
Important:
When
changing the jumpers
configuration, all
information stored in
the memory will be lost
including the weekly
program.
HC Electric
JP6
JP7
OPEN
SHORT
HC Oil/Gas
HP energized in HEAT
HP energized in COOL
OPEN
OPEN
SHORT
OPEN
SHORT
SHORT
Internal sensor
JP1
A Position
External sensor
B Position
4 minutes delay
JP3
OPEN
No delay (for test only !)
SHORT
HC / HP Configuration
Temperature Sensor
Compressor Delay
24 Hours
JP4
OPEN
12 Hours (AM/PM)
SHORT
Clock Mode
Celsius
JP5
OPEN
Fahrenheit
SHORT
Temperature Scale
Default from
factory
JP3
JP4
JP5
JP6
JP7
JP1
A
B
External Sensor Connection
Installation Procedure
Disconnect power to the thermostat.
Move JP1 to “B” position and connect the sensor to “T1” terminals.
Reconnect power.
Important:
The sensor must be MEITAV-TEC type.
NTC Sensor: Temperature ~ Resistance Characteristics
Temperature (
o
C)
Resistance (K
Ω
)
7.2 10.0 12.8 15.6 18.3 21.1 23.9 26.7 29.4 32.2
115.8 100.9 88.1 77.1 67.7 59.6 52.5 46.4 41.2 36.6
-
-
+
+
OPT
OPT
OPT
OPT
OPT
OPT
OPT
OPT
OPT
HP11
-
-
+
H.P
-
+
-
-
+
+
+
-
OPT
OPT
-
File: bdir-operating maual.vsd | Date: February 1, 2007 | Rev. 3
All rights reserved to Meitav-tec Ltd. © 2007