MANUAL
IMS-REL1000 Setup Guide
Hot-Plug Module
21st November 2019
Meinberg Funkuhren GmbH & Co. KG
Page 1: ...MANUAL IMS REL1000 Setup Guide Hot Plug Module 21st November 2019 Meinberg Funkuhren GmbH Co KG ...
Page 2: ......
Page 3: ...e Modules 2 2 1 Additional Safety Hints 3 2 2 Supply Voltage 3 2 3 Cabling 4 3 Replacement or Installation of a Hot pluggable IMS Module 5 3 1 Important Hints for hot pluggable IMS Modules 6 4 REL1000 Error Relay Module 7 Date 21st November 2019 IMS REL1000 Setup Guide ...
Page 4: ...nkuhren GmbH Co KG Lange Wand 9 31812 Bad Pyrmont Germany Phone 49 0 52 81 93 09 0 Fax 49 0 52 81 93 09 230 Internet https www meinbergglobal com Mail info meinberg de Date 2016 11 15 IMS REL1000 Setup Guide Date 21st November 2019 1 ...
Page 5: ... to the manufacturer for maintenance Exchange of hot swap components Ensure that components which will be replaced during operation always be treated with the utmost care Avoid contact with live components Electrostatic discharge can damage electronic components For this reason ensure protection against electrostatic discharges by wearing anti static shoes while working with the system Take care w...
Page 6: ...n of high voltage devices 2 2 Supply Voltage WARNING This device is powered by a dangerous voltage Nonobservance of the safety instructions of this manual may lead to serious damage to persons and property and to danger to life Installtion commissioning maintenance and operation of this device are to be carried out by qualified personnel only The general safety instructions and standards e g IEC D...
Page 7: ... work done the connectors particularly when connectors are opened may never be carried out when the installation is energized All connectors must be covered to prevent from accidental contact to life parts ALWAYS ENSURE A PROPER INSTALLATION 4 Date 21st November 2019 IMS REL1000 Setup Guide ...
Page 8: ...uilt in module Pull the module carefully out of the holding rail Note that the module is firmly anchored in the connector block of the housing You need a certain amount of force to release the module from this link Once the connection to the connector block of the system s backplane is loosened the module can be easily pulled out 3 When installing the new IMS module please ensure that the board is...
Page 9: ...operate your system with only one power supply a second power supply must be installed before removing replacing it to keep your system functioning I O ESI and MRI Slots hot swappable CLK1 CLK2 hot swappable Afer the exchange or the installation of a clock module a rescan of the reference clocks Rescan Refclocks must be executed in the web interface menu System CPU not hot swappable The central ma...
Page 10: ...maly Closed If the system isn t equipped with a second clock and RSC switch unit the relay can be switched by 10MHz or PPS to monitor these signals Error Output Relay A Clock 1 Notification Events Relays Relay B Clock 2 PPS Relay C Notification Events Relay 10MHz In redundant mode the jumpers on the REL1000 are set as follows Please note The REL1000 can only be used for the IMS system M500 in the ...
Page 11: ...f Normal Operation Mode St green Status A green red in case of error Clock 1 B green red in case of error Clock 2 C green red in case of error Notification Event Technical Specification ERROR Relays Switching Voltage 220 V DCmax 250 V ACmax Switching Load 60 Wmax 62 5 VAmax UL CSA 0 3 A 125 V AC 0 3 A 110 V DC 1 A 30 V DC Response Time ca 3 ms 8 Date 21st November 2019 IMS REL1000 Setup Guide ...
Page 12: ......