MANUAL
IMS-PIO180 Setup Guide
Hot-Plug Module
6th May 2020
Meinberg Funkuhren GmbH & Co. KG
Page 1: ...MANUAL IMS PIO180 Setup Guide Hot Plug Module 6th May 2020 Meinberg Funkuhren GmbH Co KG...
Page 2: ......
Page 3: ...re you start 8 5 1 Scope of Delivery 8 5 2 Disposal of Packaging Materials 9 5 3 Pre selection PPS 10 MHz 9 6 System Installation 10 6 1 Important Hints for hot pluggable IMS Modules 10 6 2 Replacemen...
Page 4: ...Funkuhren GmbH Co KG Lange Wand 9 31812 Bad Pyrmont Germany Phone 49 0 52 81 93 09 0 Fax 49 0 52 81 93 09 230 Internet https www meinbergglobal com Mail info meinberg de Date 06 05 2020 IMS PIO180 Set...
Page 5: ...ed and analyzed If the ports of the PIO180 are to be used as outputs the signal direction can be set to output in the LTOS web GUI see chapter 7 The LTOS7 manual provides a complete description of all...
Page 6: ...s send power supplies back to the manufacturer for maintenance Exchange of hot swap components Ensure that components which will be replaced during operation always be treated with the utmost care Avo...
Page 7: ...n of high voltage devices 3 2 Cabling WARNING DANGER TO LIFE BY ELECTRICAL SHOCK NO LIVE WORKING Wiring or any other work done the connectors particularly when connectors are opened may never be carri...
Page 8: ...oving or installing components This could result in a loss of grounding protection from your electrostatic discharge Storing Assemblies Always keep assemblies in ESD protective covers These protective...
Page 9: ...4 Front Connectors IMS PIO180 1 2 6 Date 6th May 2020 IMS PIO180 Setup Guide...
Page 10: ...LED St blue LED In 0 5 sec red 0 5 sec yellow 0 5 sec green 0 5 sec off Normal Operation LED St LED In green LED P green if card is preset to PPS LED C green if card is preset to 10 MHz St In P C 4 2...
Page 11: ...g please contact Meinberg Check the system for shipping damage If the system is damaged or cannot be put into operation contact Meinberg immediately Only the recipient the person or company receiving...
Page 12: ...shipping packaging Household waste or recycling depot accessories packaging 5 3 Pre selection PPS 10 MHz Before installing the PIO180 module select the required signal using the jumper setting PPS or...
Page 13: ...pable If you operate your system with only one power supply a second power supply must be installed before removing replacing it to keep your system functioning I O ESI and MRI Slots hot swappable CLK...
Page 14: ...he module carefully out of the guide rail Note that the module is firmly anchored in the connector block of the housing You need a certain amount of force to release the module from this link Once the...
Page 15: ...S Signal IMS LANTIME M3000 Mit PIO180 Modul with PIO180 module SyncMon zur Signal berwachung SyncMon for signal monitoring DUT PPS Signal DUT DUT PPS Signal Sync to PPS der PIO180 PPS of the PIO180 PP...
Page 16: ...irections Output In this mode either the PPS or the 10 MHz of the reference clock will be issued Input The input signal is compared with either the PPS of the system or the 10 MHz of the reference clo...
Page 17: ...face and then Node monitoring Node monitoring To monitor the signals applied to the PIO180 each input to be monitored must be added as node to the SyncMon 1 To add a node first click on the Add Node b...
Page 18: ...ut signal and the PPS of the reference clock can be displayed as a value or as a graph To display the graph of the respective port click on the ICON Graph By setting the parameters Time Range Y Range...
Page 19: ...ed biphenyls PBBs and polybrominated diphenyl ethers PBDEs Bis 2 ethylhexyl phthalat DEHP Benzylbutylphthalat BBP Dibutylphthalat DBP Diisobutylphthalat DIBP above the legal threshold WEEE status of t...
Page 20: ......