background image

4 BPE-2000 - Backplane Port Expander

4 BPE-2000 - Backplane Port Expander

Output Signals:

fixed:
PPS, 10MHz, TC-DCLS, TC-AM

Power Requirements:

5 V +-5%, 150 mA / BNC
5 V +-5%, 150 mA / FO

Status Indicators

LED St:

BPE status

LED In:

Status of the backplane’s output signals

LED A:

BPE status - output signals (1 + 2)

LED B:

BPE status - output signals (3 + 4)

Initialisation:

LED St: blue until USB is configured
LED In - LED B: off until USB is configured

USB is configured:

LED St: blue
LED In - LED B:
0,5 sec. red -> 0,5 sec. yellow ->
0,5 sec. green -> 0,5 sec. off

Normal Operation:

LED St. + LED In: green
LED A: green, if the desired signal is present
on output 1 and output 2
LED B: green, if the desired signal is present
on output 3 and output 4

BPE Outputs

Out 1:

PPS

Out 2:

10MHz

Out 3:

TC DCLS

Out 4:

TC-AM

BPE-2000

Date: 19th November 2019

7

Summary of Contents for BPE-2000

Page 1: ...MANUAL BPE 2000 Setup Guide 19th November 2019 Meinberg Funkuhren GmbH Co KG...

Page 2: ......

Page 3: ...Safety Hints 3 2 2 Supply Voltage 3 2 3 Cabling 4 3 Replacement or Installation of a Hot pluggable IMS Module 5 3 1 Important Hints for hot pluggable IMS Modules 6 4 BPE 2000 Backplane Port Expander 7...

Page 4: ...erg Funkuhren GmbH Co KG Lange Wand 9 31812 Bad Pyrmont Germany Phone 49 0 52 81 93 09 0 Fax 49 0 52 81 93 09 230 Internet https www meinbergglobal com Mail info meinberg de Date 2016 10 07 BPE 2000 D...

Page 5: ...s back to the manufacturer for maintenance Exchange of hot swap components Ensure that components which will be replaced during operation always be treated with the utmost care Avoid contact with live...

Page 6: ...ruction of high voltage devices 2 2 Supply Voltage WARNING This device is powered by a dangerous voltage Nonobservance of the safety instructions of this manual may lead to serious damage to persons a...

Page 7: ...y other work done the connectors particularly when connectors are opened may never be carried out when the installation is energized All connectors must be covered to prevent from accidental contact t...

Page 8: ...ready built in module Pull the module carefully out of the holding rail Note that the module is firmly anchored in the connector block of the housing You need a certain amount of force to release the...

Page 9: ...If you operate your system with only one power supply a second power supply must be installed before removing replacing it to keep your system functioning I O ESI and MRI Slots hot swappable CLK1 CLK2...

Page 10: ...B BPE status output signals 3 4 Initialisation LED St blue until USB is configured LED In LED B off until USB is configured USB is configured LED St blue LED In LED B 0 5 sec red 0 5 sec yellow 0 5 se...

Page 11: ...customer requirements If an output signal has to be changed this must be done via the pre connected receiver in the menu Clock Switch Card if you have a redundant system or in the menu Clock Receiver...

Page 12: ......

Reviews: