![Meijer Holland Fred 2-3 Manual Download Page 24](http://html1.mh-extra.com/html/meijer-holland/fred-2-3/fred-2-3_manual_1765918024.webp)
Fred 3‒4 / Fred 2‒3
24
6. Operation and use
1.
Drive the vehicle in such a way to the bale that the lowest front loader tines push into the
bale.
2.
When the frame pushes against the bale, the hydraulic system can be operated. Once the
bales are clamped, put the hydraulic system back in neutral.
3.
Lift the bale and drive to the place of destination or to the next bale, as seen in the figure
below.
4.
Let the bales sink to the loading floor and put the hydraulic system in ‘return’. By doing
so, the hooks open and the bales are released.
5.
Drive the vehicle away so that the three front loader tines are pulled straight out of the
bales.
6.
The bale grab is ready to grab and move another series of bales.
Use Fred 3-4