32
6. Flushing and filling the system
•
Before starting, open all shut-offs and set the primary mixer servomotor manually to 50% in manual mode (refer to the manufacturer's documenta-
tion) so that all lines are open.
•
The flushing, filling and bleeding must be carried out professionally and correctly.
•
Flush the system carefully before filling.
•
Check all connections and repair them if necessary.
•
Ensure all threaded joints are screwed tightly.
•
Once the system has been filled, bleed the station and refill the heating system as required.
•
Use the bleed devices on the station.
•
The primary mixer servomotor must be manually reset to automatic upon completion.