Basic Installing method
*Footing (Surface mount)
1.
Draw line as footing layout drawing.
2.
Make sure the ground level of site.
3.
Assemble Deck with posts.
4.
Adjust right position.
5.
Assemble Climbers (i.e. Arched climber,
Chain climber, etc.)
6.
Assemble Slides.
7.
Assemble Panel.
8.
Make sure the anchoring of all equipment.
9.
Tighten all bolts and nuts.
* Footing (Inground)
1.
Make sure the ground level of site.
2.
Draw line as footing layout drawing.
3.
Dig ground.
4.
Bury concrete cube.
5.
Assemble Deck with posts.
6.
Adjust right position.
7.
Assemble Climbers (i.e. Arched climber, Chain climber, etc.)
8.
Assemble Slides.
9.
Assemble Panel.
10.
Make sure the anchoring of all equipment.
11.
Tighten all bolts and nuts.
C CAUTION: In order to provide a safety environment, always install an impact-
absorbing material under and all playground equipment.