
11
Installation
Mechanical Installation
The 971IPS is a medium to long-range bar. Dependent on the application, the bar will
be mounted between 150mm and 900mm from the target surface.
The bar should be mounted securely, using all the M4 T-bolts provided with the bar.
Correct positioning of the bar is vital for effective static control. Ideally, there should
be no metallic objects or obstruction between the bar and the material. The diagram
shows the area that should be kept clear.
Where
x
lengths are equal.
Your Meech distributor will be able to help you with the best position for your
installation.
Summary of Contents for Hyperion 971IPS
Page 1: ...1 Hyperion 971IPS Operating Manual Long Range DC Bar...
Page 2: ......
Page 4: ......
Page 21: ...19 Health and Safety Emission of Ozone Considerably below international standard of 0 1ppm...
Page 22: ...20...
Page 23: ......