Meech Hyperion 907 Operating Manual Download Page 17

Repairs And Warranty

The Hyperion power supply is warranted by Meech Static Eliminators Ltd to the 
original purchaser against defects in the material and workmanship for two years after 
shipment. Should any malfunction occur, please return the power supply directly to 
Meech Static Eliminators or your local distributor. All products returned to the factory 
MUST be accompanied by a return authorisation number and must be shipped 
prepaid. For prompt service, ship the unit to the factory with the return authorisation 
number shown clearly on the label. Be sure it is well packed in a sturdy carton with 
shock absorbing material.

Include a note stating the nature of the problem as specifically as possible, and also 

include instructions for returning the power supply to you. We will pay one-way return 
surface shipping costs on any repairs covered under the warranty.

Field repairs should not be undertaken under the warranty period. Repair attempts by 

unqualified personnel will invalidate the warranty.

CE Approval

A CE Declaration of Conformity for this product exists in respect of the Low Voltage 
Directive:72/23/EEC (“LVD”) & Electromagnetic Compatibility Directive: 89/336/EEC 
(“EMCD”) 

Health and Safety

Emission of Ozone: Considerably below international standard of 0.1ppm

 

 

       

Summary of Contents for Hyperion 907

Page 1: ...Operating Manual Hyperion 907 High Voltage Power Supply v1 15B...

Page 2: ......

Page 3: ...d or trade marks For further information please refer to our Head Office or visit www meech com Meech Static Eliminators Ltd 26 10 2017 Contents Introduction 3 Input Voltage and Connection 4 Installat...

Page 4: ......

Page 5: ...nal features include a pin cleaning alert and adjustable balance The 24V DC input voltage suits modern machinery and means that they operate independently of local mains voltage and frequency Settings...

Page 6: ...is evident do not destroy the carton or packing material and immediately notify the carrier of a possible damage claim Shipping claims must be made by the consignee to the delivering carrier Contents...

Page 7: ...sed for mounting it is important that the power unit is mounted in such a way so oil or moisture from other sources cannot contaminate the power unit Failure to the unit through contamination will inv...

Page 8: ...e swivel connector of the appliance Push the connector through a port in the Hyperion power supply Re fit the lock washer and nut to secure the appliance cable Make sure the nut is fully tightened Rem...

Page 9: ...stage 1 make sure all of the nuts are fully tightened before the lid is attached 24V 4 pole extension cables are available from Meech in 1 3 and 8 meter lengths Ensure the 24V supply is off before con...

Page 10: ...F OK Green LED 24V 0V OK Green LED 0V 0V Dirty Faulty Red LED 0V 0V Dirty Faulty Red LED 24V 0V External Relay Wiring 10k Pull up 24VDC 0V Imax 20mA NO COM NC Relay Power Normally Open Output Matrix N...

Page 11: ...lour and state show whether the system is operating correctly or whether it needs attention The meaning of the colours and states is as follows Colour State 907 Green Continuous OK Green Flashing slow...

Page 12: ...Weight 2 2kg Input Voltage 24V DC N B Supply must be grounded Input Current 200mA 2A Load Dependant Output Voltage 4000 7000V AC Output Frequency 67Hz Connection Murr 4pin M8 Earth terminal Settings C...

Page 13: ...t damage the equipment but may result in a small shock caused by the stored energy in the bar Attach the cable on the BarMaster to the M8 connector on the power unit then connect the M8 connector from...

Page 14: ...To scroll through the menu use the up down function To adjust Frequency Balance feedback Alarm levels or to reset the ion reference current use left and right function Please note the OK button in the...

Page 15: ...s will be neutralised faster if the bar is biased to a positive balance 50 Pos Hi accuracy neutralisation can be required in applications involving electronic circuitry E g RFID tag production In the...

Page 16: ...ce level when the bar is clean It is set by Meech during initial calibration It should be reset after making changes to either the balance or the frequency of the output Make sure that the bar is clea...

Page 17: ...arly on the label Be sure it is well packed in a sturdy carton with shock absorbing material Include a note stating the nature of the problem as specifically as possible and also include instructions...

Page 18: ...R USED FOR MANUFACTURE OR OTHERWISE DISCLOSED WITHOUT THE PRIOR WRITTEN CONSENT OF MEECH INTERNATIONAL MATERIAL FINISH TOLERANCE UNLESS OTHERWISE SPECIFIED Machined Work Metric 0 1mm Unmachined Fabric...

Page 19: ......

Page 20: ...232 4210 Fax 1 330 564 2005 email info meech com Meech Shavotech 29 2 Kharadi Off Pune Nagar Road On Old Kharadi Mundhwa Road Pune 411014 Maharashtra India Tel 91 0 703 093 8211 91 0 741 000 4817 Fax...

Reviews: