Connect the Pads
Attach the Kick Pad
Attach the Drum Module
Attach the Cymbal Pad
Connect the Pads to the Drum Module with labelled cables.
Hand bolts
Connection
Cable
Position the one beater
in the center of the kick pad.
Drum Module
Kick Pad
Tom / Snare
Crash / Ride
Hi-hat
Drum Module
Tom 1
Kick
Tom 2
Tom 3
Ride
Crash
Hi-hat
Snare
Hi-hat Control
Kick Pad
Kick Pedal
Beater
Step
Step
Step
Step
Pedal ( Hi-hat )
DD610_G03
C
M
Y
CM
MY
CY
CMY
K
AW_DD610_Setup manual_G03_180502.pdf 2 2018-05-02 14:47:10