background image

2

Attach the Parts

Attach the Pads

1

2

1.Loosen wing nut on the holder          
   clamp, which is on the  center 
   pipe(1),side arm(L2)and side
   arm

R

.

2.Attach drum pads to the holder   
   clamp on center pipe(1),side  
   arm(L2),side arm(R) and tighten 
   wing nuts. Repeat for each pad.

Wing Nut

Attach the Cymbal Pads

1. Remove the wing nut and felt 
    washer from the cymbal tilter.

2. Place the cymbal pad, felt 

washer, wing nut 3 assembly as 
shown, and tighten the wing nut 
3 to obtain an appropriate 
amount of sway.

3. Adjust the cymbal pad position 

with the wing nut 4.

    
    
    
    

    

Wing Nut 3

Felt Washer

Wing Nut 4

Cymbal Tilter

3

2

Assemble the Kick

1. Insert the beater to the beater holder on 
    the foot pedal.

2. Adjust the beater position and tighten   
    the beater with the drum key.

3. Attach the foot pedal to the kick pad.

4. Adjust the beat position and tighten the 
    wing nut. 

Note:

Position the one beater in the center 
of the kick pad  kick .

         

    

    
    

 

1

2

3

4

Wing Nut 

Center Pipe(1)

Side Arm(L1)

1

1

2

2

Side Arm(L2)

2

2

1

Side Arm(R)

Center Pipe(2) 

1

Pillar(L)

Pillar(R)

 Hi-Hat

 Crash

 Ride

1

Reviews: