Mecalux LONGSPAN M7 Assembly Instructions Download Page 2

Assembly instructions: 

Longspan M7

www.mecalux.co.uk/shop           Tel. 0121 333 6602

T

S

60

0

60

0

60

0

60

0

60

0

10

0

10

0

10

0

10

0

10

0

10

0

V

Frame Assembly

Beam Assembly

1

4

2

5

3

Leaving a gap of 100 mm, attach a long 
diagonal bracing beam (C). Then screw 
in the rest of the long diagonal bracing 
beams in a zig-zag pattern, maintaining 
the same distance between each beam. 
The following diagram shows how 
the finished frame should look.

Measurement criteria applied  

The first joint (S) should be facing the 
access aisle. The distance marked (T) 
should measure between 100 and 700 
mm. The distance marked (V) should 
measure between 50 and 150 mm.

Next, attach a footplate (G) to the bottom  
end of each of the uprights 
(A). Each footplate is attached 
using two M 8x15 bolts (I).

Fix one of the short diagonal bracing 
beams (D) into the second interior hole 
(H) of each upright (A) using two M 8x40 
bolts. The orientation of the slots in the 
upright must be as shown in the diagram, 
making sure that the open face of each 
diagonal is facing the same way.

Position the beams (B) on the upper 
level, one at the front and one at 
the back, connecting the two frames. 
Next, add the lower levels. 

Fix each beam with two safety 
pins (J), so they are held in place, 
flush to the upright (A).

Once all the beams 
are in place, lift the 
structure and place it 
into its final position, 
then put the shims 
(levelling plates) 
(K) underneath the 
upright footplates. 
Finally, fix the frame 
to the floor with one 
anchor bolt (F).

M 8x15
Bolts (I)

Long 
Diagonal 
Bracing 
Beam

Footplate (G)

Diagonal Bracing Beam (C)

Montant (A)

Upright (A)

Upright (A)

Upright (A)

Beam (B)

Safety pins (J)

Anchor 
Bolt (F)

Shim (K)

Place two uprights (A) 
parallel to each other on a 
workbench or on the floor.

Diagonal Bracing Beam (D)

GROUND

Second 
Interior 
Hole

1

2

3

4