Gas side
( k)
f
(Liquid side
f
J)
Wiring hole (
)
f
38
)
Drainage pipe installation hole (
f
32
Humidifier hole (inside)
80
300
185
2
0
0
1
4
0
7
3
170
100
2
4
0
1
2
8
II
Below the ceiling
Panel
Hole
Hook(on Field)
7
30
106
30
1
3
8
3
9
2
0
G
1
0
6
130
13
0
20
0
32
18
(
f
100)
Hole
Below the ceiling
INDOOR UNIT INSTALLATION
A
Drain side
Piping side
80
0
(H
oo
k-
lo
ca
tio
n)
D(Hook-location)
80
0
(B
od
y)
C (Body)
8
80
(C
ei
lin
g
ho
le
)
B (Ceiling hole)
94
0
(P
an
el
)
A(Panel)
Please select a place where sound enough
to bear the indoor unit when installation
The Indoor Unit is possible to fall if the place
is not sound enough.
To take precautions against typhoon/earth
quake.
Be sure to install strictly according to related
specification. Wrong installation will
cause the unit to fall.
!
CAUTION
4
Model(MDV-D)
A
B
C
D
E
F
940
1350
880
1290
820
1230
620
1030
405
610
400
605
28~36Q
4
/N
2
71~80Q
4
/N
2
90~112Q
4
/N
2
G
H
I
J
K
L
M
260
320
536
946
130
180
f
9.5
f
19.0
196 136
246 186
28~45Q
4
/N
2
56~80Q
4
/N
2
90~112Q
4
/N
2
Model(MDV-D)
Select installation location considering piping and wiring connection after the Indoor Unit has
been hanged. Then decide the piping wiring leading direction.
Be sure to lead the refrigerant pipes, drain pipes and connection wires out to its connection
location before hanging the unit if the opening on the ceiling has been decided.
Confirm sizes of the indoor unit and ceiling opening with the attached installation paper
pattern. (Please fix the paper pattern below the body with M5X16 screws (4).)
Summary of Contents for MDV-D112Q4/N2
Page 18: ...6292aW ...