
FC1
000-400
INSTALLATION OPERATION AND TROUBLESHOOTING
1.
Inspect unit for visible transit damage. Should there be any cause for concern, please contact
factory before returning unit. No returns will be accepted without a Return Authorization
2.
Check that the power supply input matches to the applicable input source.
3.
Connect input and output according to the labels on the unit.
4.
Verify that the proper wire gauge is used to minimize the line loss. (Guidelines for wire size
applications are included.)
5.
The output voltages and current limits are factory set according to the specifications. Should it
be necessary to re-adjust any of these parameters, please consult with Engineering
6.
This unit is fan cooled. Ensure that minimum 4” space left at the intake and exhaust openings.
SAFETY CONSIDERATIONS
1.
The unit has hazardous voltages at any part of the power supply circuitry also on the terminal
blocks. Therefore the unit can be operated by qualified and instructed personnel only. Avoid
touching any component or parts inside the unit. Wait a minimum of 30 seconds after
removing the input power before doing any operation on the power supply.
2.
The chassis of the unit is connected internally to the GND terminal. One ground terminal is
provided on the terminal block.(Terminal #3) and the M5 bolt on the chassis. It is sufficient to
wire up one of these terminals only.
3.
Use the proper screw sizes for mounting.
4.
This unit is electronically protected. If the system doesn’t work properly, we recommend that
the operator do not replace any of the internal fuses on the power modules or attempt repair.
Return the power supply for servicing.
5.
Repairs should only be performed by qualified service personnel.
Summary of Contents for FC1000-400
Page 4: ...Wiring Diagram FC1000 400...
Page 5: ...TERMINATIONS FC1000 400 Input...
Page 7: ...PHOTOGRAPHS FC1000 400...