FIG. 3
5
6
2
2
3
3
4
7
8
5
6
FIG.1 & 2
3
.
Attach the Tubes - 2 (#2) to the Tube - 3 and Tube - 4 (#3 & #4) using the spring lock mechanism (pre-installed) as
shown in FIG.1.
4. Attach the Tubes - 7 (#7) to the Tubes - 8 (#8) using the spring lock mechanism (pre-installed) as shown in FIG. 2
www.themdsports.com
1558123
5
(Continued on the next page.)
FIG.3
5. Attach the Tube - 5 and Tube - 6 (#5 & #6) together using the spring lock mechanism (pre-installed) as shown
in FIG. 3.
X 2
X 1
X 1
X 2
X 2
X 1
X 1
FIG. 1
FIG. 2
2
4
Punched hole
7
8
Spring Lock
P1
Spring Lock
P1
Spring Lock
P1
Spring Lock
P1
P1
X 4
P1
X 1