CSP-HMI-3
MD Helicopters, Inc
.
MAINTENANCE MANUAL
Page 202
Revision 7
95-10-00
The information disclosed herein is proprietary to MD Helicopters, Inc.
Neither this document nor any part hereof may be reproduced or transferred to
other documents or used or disclosed to others for manufacturing or any other
purpose except as specifically authorized in writing by MD Helicopters, Inc.
Copyright
©
1999
−
2016 by MD Helicopters, Inc.
(8). Check pitot pressure system for leaks
and repair leaks as necessary.
(9). If optional heated pitot tube is in
stalled, install heater cover. If not,
install red pitot tube cover.
(10). (Slim-Line instrument panels only)
Reinstall instrument panel fairings and
cover panel.
(11). (L/H command T-Panels only) Reinstall
instrument panel fairings.
5. Static Tubing Replacement (369D/E/FF)
(Ref. Figure 201 for 369D helicopters,
Figure 202 for 369E/FF helicopters)
Consumable Materials
(Ref. Section 91
−
00
−
00)
Item
Nomenclature
Adhesive, epoxy
When performing maintenance
near engine air inlet, comply
with precautions necessary in engine air in
let area (Ref. Sec. 01-00-00).
(1). Remove instrument panel fairings,
forward right side fairing of engine air
intake and plenum chamber access
door.
(2). Remove tube from single static port in
engine air intake fairing by breaking
bondline.
(3). Remove nylon straps attaching main
tube (Ref. view B) and drain valve, if
installed, to canopy structure.
(4). Remove nylon straps attaching main
pressure tube to air intake fairing
longeron, aft section strut and structure
(Ref. view A, C).
(5). Disconnect aft end of tube from tee
fitting.
(6). Disconnect main pressure tube from
altimeter and cover instrument open
ing.
(7). Withdraw main pressure tube through
canted bulkhead grommet.
(8). Remove crossover tube from altimeter
and airspeed indicator.
(9). Route replacement main pressure tube
through grommet in canted bulkhead
and locate aft end of tube at static
pressure port tee fitting.
(10). Secure main pressure tube to canopy
structure with nylon straps (Ref. view
B).
(11). Attach main pressure tube to air intake
fairing longeron, aft section strut and
structure (Ref. view A, C).
(12). Secure main pressure tube and drain
valve to canopy structure; then connect
tube to tee on altimeter.
(13). Using adhesive (CM411), bond tube to
static pressure port in engine air intake
fairing. Outer end of tube must be flush
with screen surface. Ensure protective
screen is not blocked.
(14). Connect crossover tube to altimeter and
airspeed indicator.
(15). Check that system tubing and fittings
are secure and airtight.
(16). Reinstall instrument panel fairings, air
intake fairing and plenum chamber
access door.
6. Static Tubing Replacement (500/600N)
Consumable Materials
(Ref. Section 91
−
00
−
00)
Item
Nomenclature
Sealant, solvent resistant
(1). Remove instrument panel fairings.
(2). Remove tube from static ports on
forward canopy side structures.
(3). Remove clamps attaching static tubes
to canopy structure.
(4). Disconnect main static tube from
altimeter and cover instrument open
ing.
(5). Remove crossover tube from altimeter
and airspeed indicator.
CAUTION
Summary of Contents for 369-500
Page 14: ......
Page 30: ......
Page 82: ......
Page 94: ......
Page 106: ......
Page 116: ......
Page 134: ......
Page 150: ......
Page 162: ......
Page 168: ......
Page 178: ......
Page 226: ......
Page 232: ......
Page 244: ......
Page 346: ......
Page 416: ......
Page 444: ......
Page 458: ......
Page 472: ......
Page 490: ......
Page 536: ......
Page 560: ......
Page 578: ......
Page 604: ......
Page 612: ......
Page 616: ......
Page 628: ......
Page 654: ......
Page 678: ......
Page 706: ......