INSTALLATION AND USE MANUAL
Chapter 4
page
19
Installation and assembly
Technical service - MCZ
S.p.A. all rights reserved - Reproduction prohibited
4. INSTALLATION AND ASSEMBLY
IMPORTANT!
The stove must be installed and connected to the
chimney flue by specialised technicians or skilled
personnel so that every local or national regulation is
met and, in any case, in accordance with regulation
UNI 10683 REV.
When the stove and frame is unpacked,
make sure all parts are in
perfect
working order and check for damages due to transport.
If the stove is installed in a place that is difficult to access, the weight
can be reduced by removing internal elements in the furnace.
Please
remember to correctly reassemble all elements.
4.1.
PREPARATION AND UNPACKING
Open the packaging, remove the brackets, remove the stove from the
platform and position it in the selected area making sure it meets that
foreseen.
The stove must always be kept upright and exclusively moved with a
trolley. Pay careful attention that the door and its glass are protected
from mechanical collisions that could jeopardise their integrity.
Moving the product must always be done with care. If possible, unpack
the stove in the area where it is to be installed.
Packaging material is non-toxic, therefore it does not require special
disposal.
The end use must store, dispose or recycle packaging material in
accordance with local regulations.
4.2.
POSITIONING
Always assess the static conditions of the floor that will hold the weight.
If the rear wall is made of flammable material, insulate it and
place the stove at least 30 cm from the wall.
Lateral insulation
must reach at least 50 cm from the right, left and top corners.
If the stove is installed on a flammable floor,
adequate insulation is recommended.
Heat sensitive or flammable parts and objects cannot
be stored near the stove: keep these object or parts
at least 100 cm away from the most protruding stove
part.
Stove packaging example
1000
500
3
0
0
M
in