4
IM 1128-2
16.
The control panels are shipped separately but have all sensors wired in, labeled and tied up.
Matching labels will exist at the sensor connection on the unit.
17.
Contact your service representative for McQuay International for pricing and scheduling of
required installation supervision.
TYPE III:
The unit ships fully assembled and is field ready to knockdown. Included are the vessel
bolt-on connection brackets, the discharge stack bolt-on flanges at the condenser and the bolt-on oil
pump assembly.
1.
The unit is shipped fully charged with refrigerant and lubricant.
2.
The unit will be factory insulated and painted.
3.
All electrical and sensor wiring will be fastened as usual.
4.
The starter will ship per order instructions.
5.
Touch up paint and stick-on wire ties will be included.
6.
This unit will be fully tested at the factory.
7.
Labels will be provided with the instructions to mark piping, electrical wiring and sensor wiring.
NOTE
: If disassembly involves breaking any refrigerant connection, the refrigerant charge must be
pumped down and isolated in the condenser.
Typical WSC Centrifugal Chiller
Summary of Contents for WMC-B 145D
Page 17: ...IM 1128 2 17 Figure 18 Unit panel wiring and connections Figure 15 Unit panel detail ...
Page 25: ...IM 1128 2 25 Figure 18 Compressor Control Box ...
Page 26: ...26 IM 1128 2 Figure 19 Unit Control Box ...
Page 27: ...IM 1128 2 27 Figure 20 Flow Switch Wiring ...
Page 28: ...28 IM 1128 2 Unit Photographs Figure 21 WSC 087 Photo Figure 22 WSC 100 Photo ...
Page 29: ...IM 1128 2 29 Figure 23 WSC 126 Photo ...
Page 31: ...IM 1128 2 31 Field Insulation Guide Figure 24 Insulation Requirements ...
Page 32: ...32 IM 1128 2 ...
Page 51: ...IM 1128 2 51 Figure 32 Type IV Liquid Line Removal Figure 33 Type V Liquid line Removal ...
Page 52: ...52 IM 1128 2 Figure 34 Type V Vessel Separation ...