MC Electronics UC 200 IR Instructions For Use Manual Download Page 9

 

Installazione e uso 

                                                                                     

9

 

UC 200 IR 

 

4. Changing password 

 
The programming access Password can be changed in the following way : with the 
monitor off (disconnected from the power supply) press all three keys simultaneously 
and hold them down for about 10 seconds until the display shows “P----“, now release 
the keys and input the new password, use the external keys to change the value of the 
first digit and with the middle key go to the next digit.  
 

Technical features 

 
 
 
 
 
 
 
 

Power supply voltage  

From 9 to 16 Vdc 

Maximum absorption  

60 mA @ 16Vcc (sensors excluded)  
80 mA @ 16Vcc with pressure transducer (

1

Operating temperature 

-20°C ÷ +75°C 

IP Protection degree 

IP65  

Mechanical resistance 

  2 g 

Material 

ABS  

 

(  (1)  =  sample  calculation  12V  power  battery  :  setting  the  hourly  consumption  at 
80mA/h,  setting  10  hours  of  daily  work  therefore  80*10=800mA  daily,  setting  30 
consecutive working days thus 800*30=24A=24000mA 
Therefore,  if  the  sprayer  worked  consecutively  for  1  month,  consumption  would  be 
24A.  If  you  cannot connect  UC 200  IR  to  the  tractor  battery  it  is advisable  to  use a 
battery  with  at  least  twice  the  calculated  value  capacity,  thus  48A:  for  example  a 
battery for small cars. 

Summary of Contents for UC 200 IR

Page 1: ...UC 200 IR UNIVERSAL MONITOR FOR SPRAYING Intructions for use NR 1230 EN Rev 2 EN...

Page 2: ...l 39 0425 754713 Fax 39 0425 741130 E mail mcstaff mcelettronica it Internet www mcelettronica it Manual code 1230 EN Issued May 2012 Edition February 2020 MC elettronica S r l is not obliged to give...

Page 3: ...Installazione e uso 3 UC 200 IR Index 1 Rules and general warnings 4 1 1 Introduction 4 1 2 Terms of guarantee 5 1 3 After sales service 5 2 Installation 6 3 Programming 7 4 Changing password 9...

Page 4: ...uipment After buying the Speed indicator read the manual carefully and refer to it any time you have doubts on how to use the equipment or when you have to carry out maintenance operations Keep the ma...

Page 5: ...of God lightning floods fire or any other causes which do not depend on MC elettronica Repairs under guarantee which must be carried out in the laboratories of our authorized centres are entirely fre...

Page 6: ...possible to compensate for its related loss in pressure with a special programmable parameter see chapter on Programming Selecting the type of sensor UC 200 IR is factory set to work with a pressure...

Page 7: ...programmed see below 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 P 22 Flow rate at 5 Bar of the P nozzle this parameter is always required even if in the previous parameter one of the standard...

Page 8: ...th a pressure transducer to match the choice of the sensor type described on the previous page P or F P At the end of the parameters it is possible to change the m3 counter totals the totalled current...

Page 9: ...ge From 9 to 16 Vdc Maximum absorption 60 mA 16Vcc sensors excluded 80 mA 16Vcc with pressure transducer 1 Operating temperature 20 C 75 C IP Protection degree IP65 Mechanical resistance 2 g Material...

Page 10: ...ed in Italy UC 200 IR WARNING THIS PRODUCT CONTAINS TIN AND LEAD IT MUST BE DISPOSED OF AT THE END OF ITS LIFE CYCLE AT THE DESIGNATED DISPOSAL FACILITIES OR DELIVERED DIRECTLY TO MC ELETTRONICA SRL I...

Page 11: ...Installazione e uso 11 UC 200 IR NOTES...

Page 12: ...Printed in Italy UC 200 IR Electronic equipment for agriculture www mcelettronica it...

Reviews: