MAY DMZ329 Installation Instruction Download Page 6

 
 

Stand 40-081 

English 

page 6 of 9 

2.

 

Insert the M16 countersunk screws into the bore holes of the coupling plate and so screw 

the upper anchor tube with coupling plate onto the flange plate (see fig. below). Attach the 

nuts from the bottom. Do not tighten the screw connection firmly yet. 

 

    

 
 

 

3.

 

As a practical matter, the ground screw is never screwed in 100% straight. Therefore, the 

upper part must be aligned with a water spirit level (see fig.). Adjust the set screw and the 
M 16 screw as long as your spirit level indicates that the plate is horizontal. Then apply 

210 Nm to tighten the screw connection.  

 

 

   

 

 

90° 

90° 

M16 countersunk screw 

M16 nut 

+ 16 mm washer 

upper tube 

ground screw 

check 2 sides with 

the spirit level 

set screw 

M16 countersunk screw 

set screw 

Summary of Contents for DMZ329

Page 1: ...ting instructions can result in personal injuries or damage to property Please note that if these instructions are not observed the manufacturer cannot assume any liability or guarantee Always follow...

Page 2: ...ing machine is suitable or whether a larger machine must be used This soil analysis is only binding in case of a homogeneous soil fabric 4 This manual illustrates the 5 steps to fasten the ground scre...

Page 3: ...the vertical predrill Pay attention to the chapter Placing the ground screw 2 Step 2 Preparation For preparation for the 2 m ground screw a smaller ground screw about 1 2 m long must be screwed in and...

Page 4: ...arried out by your MAY dealer 1 Step 4 Alignment See chapter Alignment and fixation of upper anchor tube for detailed instruction 4 Step 5 Finish Fill up the gravel and place the paving as close as po...

Page 5: ...ork loose If screws are not tightened firmly enough there will not be sufficient tensile force to trigger self locking If the screws are tightened too firmly and over stressed the screw connection may...

Page 6: ...firmly yet 3 As a practical matter the ground screw is never screwed in 100 straight Therefore the upper part must be aligned with a water spirit level see fig Adjust the set screw and the M 16 screw...

Page 7: ...h parasol and its corresponding accessories should be marked during dismounting with punch marking or waterproof marker e g for winter storage Marking saves a lot of time and helps to keep things in o...

Page 8: ...0 telescopic guiding rod system guiding safety bar screw in attachment F1234567 4 Cable reel 5 1 2 m ground screw 6 Spade shovel small trowel 7 Spirit level tape measure possibly 8 Folding rule 9 Hexa...

Page 9: ...uled please inform us 2 working days ahead paved ground ________________________ yes no tarred ground ________________________ yes no underground construction waste _________ yes no Soil class Terrain...

Reviews: