background image

Wall mounting

Step 5-1 wall mounting assembly: pay attention to the direction 

when installing the elbow. Install the elbow with M5 * 16 screws 

 (Refer 

gure 1-12 )

Figure 1-12

Figure 1-13

Step 5-2: determine the position of hanger to be installed on the wall,

 paste the label of drilling position, align the hole location with drilling 

 tool, drill 4 

Φ 

10 holes, knock in expanded rubber particles, and screw

 in ST6 * 45 self tapping screw to install the top mounting plate 

  assembly on the wall. Refer 

gure 1-14 (Suitable for wall mounting)

Step 5-3: after passing the corresponding wire rod of the projector 

 through the inner tube, lift the octopus with both hands (with the projector 

  installed) and hang it on the axial screw along the guide chute, and lock 

  the left and right four adjusting screws. 

  Refer 

gure 1-15 (Suitable for wall mounting)

Figure 1-14

Figure 1-15

Figure 1-16

Electric drill

Safety precautions before

installation and use

Step 5-4: reference for wall mounting commissioning 

(Hoisting step 4.4)

adjusting handle

adjust screws (2 sides)

adjust

 

tilt

 

inner

 

hexagon

 

screws

(

2 sides)

adjust screws (horizontal, left,right)

 

Please

 

ensure

 

the

 

ceiling/wall

 

can

 

load 

 

50KG to

 

 

prevent accident from happening.

 

Don

'

ttilttheprojectortoomuch

,

antifalling,

screws shouldbetighten.

Don't take apart any components after hanging.

No dismantle

Attention

Warning

Reviews: