LIFT CORPORATION
Sht. 8 of 9 DSG#
M-16-08
Rev. - Date: 05/05/17
© MAXON Lift Corp. 2017
CONNECTING SECOND CABLE TO G/D PUMP
FIG. 8-1
CONNECTING SECOND CABLE TO P/D PUMP
FIG. 8-2
JUNCTION BLOCK
DUAL
CONTROL SWITCH
MAIN CONTROL
SWITCH CABLE
STARTER SOLENOID
COIL DRIVE (+) TERMINAL
10A FUSE
10A FUSE
GREEN WIRE
BLACK WIRE
CONNECTION TERMINAL
WHITE WIRE
POWER DOWN MODULE
TERMINAL 2
TERMINAL 1
MAIN CONTROL
SWITCH CABLE
STARTER SOLENOID
GREEN WIRE
GROMMET
BLACK WIRE
WHITE WIRE
DUAL
CONTROL SWITCH
GROMMET