Introduction 

The 

matt

:

e

  range of Electric Vehicle Charger Connection Units are 

fitted with O-PEN technology designed to protect Electric Vehicle 

Charging equipment when installed onto 3 phase PME infrastructures.  

 

The unit incorporates two 5 pole isolators with a built-in under-voltage 

release mechanism.  On detection of fault conditions the O-PEN 

electronic circuit de-energises the under-voltage release mechanism 

which disconnects all poles of the supply including CPC. The 5 pole 

isolator will automatically reset after a PEN fault but must be manually 

reset after an overcurrent fault in line with IET Wiring Regulations and 

code of practice.   

 

The 

matt

:

e

 O-PEN technology does not require earth rods or measuring 

electrodes to function correctly. 

 

The units are designed to be installed indoors between the distribution 

board and the Electric Vehicle Charger.  The unit must be mounted 

securely to a solid surface with the lid hinges on the left. 

 

 

The installation location should be clean, dry and well ventilated.  
 

 

 

 

 

Please refer to the diagrams on the following pages for the dimensions 
and mounting arrangement of the unit. 
  

 

 

Summary of Contents for ARD-1-100TP

Page 1: ...Electric Vehicle Charger Connection Unit ARD 1 100TP Installation Manual V1 0 Oct 2021...

Page 2: ...7 Operating Instructions 9 Test Function 9 Specifications 10 Warranty 10 Declaration of Conformity 11 PRODUCT ADVISORY NOTICE This product must be installed by a competent person in accordance with t...

Page 3: ...Please read and observe the following notices carefully These warnings must be observed when installing and operating the Electric Vehicle Charger Connection Units All relevant supplies must be isolat...

Page 4: ...s all poles of the supply including CPC The 5 pole isolator will automatically reset after a PEN fault but must be manually reset after an overcurrent fault in line with IET Wiring Regulations and cod...

Page 5: ...ARD 1 100TP EV Charger Connection Unit V1 10 5 P a g e...

Page 6: ...ARD 1 100TP EV Charger Connection Unit V1 10 6 P a g e...

Page 7: ...ARD 1 100TP EV Charger Connection Unit V1 10 7 P a g e Electrical Connections The user wiring connections are indicated in the diagrams below...

Page 8: ...hould be connected to the terminal block Connect the outgoing cable and CPC to the terminal blocks THIS PRODUCT IS DESIGNED FOR AN ISOLATED EARTHING ARRANGEMENT CHECK BEFORE USING SWA CABLE On complet...

Page 9: ...supply to the under voltage release mechanism of the 5 pole isolator This will cause the 5 pole isolator to open disconnecting all phases neutral and CPC from the load Once the fault condition has cle...

Page 10: ...tion 12VA Ingress Protection IP4X Document Revision V1 10 Oct 2021 Terminal Capacities Min Max Incoming Isolator cable size tightening torque 2 5 mm 2 1 5Nm 25 0mm 2 2Nm Outgoing Terminals cable size...

Page 11: ...ications have been applied EN60255 1 2010 Emissions standard for Measuring Relays and Protection Equipment EN55011 Class A 2011 A1 2017 Emissions Standard for ISM Equipment EN60255 26 2013 Immunity st...