20
STEP 2
| TOP CAP ASSEMBLY INSTRUCTIONS & NOTES
ID
DESCRIPTION
QUANTITY
25
M8 X 25L SHC
4
26
M8 Flat Washer (20 mm diameter)
4
27
Top Cap
1
26
25
27
ASSEMBLY
PART 7: PLASTICS ASSEMBLY
Install the top cap onto the weight stack as shown.
Torque to 17 N-m/147 in-lbs.
Position top cap so that the instructional placard faces the user.