4.0 INSTALLATION OF THE STEP SPACERS
4.1
For 6”, 8” and 10” pipe place the spacer bolt through the hole in the top of the saddle and tighten into the step spacer
as shown in the pictures below.
4.2
For 12” pipe place the step spacer bolt on top side of the saddle with the flat side facing outward. Align the hole in
the center of the step spacer with the hole on the top side of the saddle. Insert the spacer bolt through the hole in
the bottom side of the saddle and tighten.
4.3 If the is necessary to securely tighten the step spacer a coin can be place in the half moon slot on top of the spacer
bolt.
6” Pipe
8” Pipe
10” Pipe 12” Pipe
Picture 3 – Step Spacer Installation
5.0 INSTALLATION OF THE 2SA SADDLE MACHINE ON THE PIPE
5.1
Place the 2SA Machine Saddle squarely on the pipe, as close as possible to the cut line. All 4 spacer bolts or step
spacers should contact the pipe.
5.2
Place the hook of the Boomer (Figure 3 item 1) into the Boomer Eye (Figure 5 Item 7) on the Saddle (Figure 5 Item 1).
5.3
Place the Spring Snap (Figure 2 Item 4) into the Boomer Eye (Figure 5 Item 7) on the other side of the 2SA Saddle
(Figure 5 Item 1).
5.4
In order to get a stable installation of the 2SA Saddle Machine, the Spring Snap (Figure 3 Item 4) of the Boomer
Assembly (Figure 3) must be adjusted on the Chain (Figure 3 item 3) so that the spring is stretched approximately 1/2"
-3/4” (12 - 19mm) when the Boomer is closed.