background image

STEP

 3

Use 3M | Scotchlok

 connectors (UY2) to connect new AMI Endpoint unit. Prior to connecting wires together, make sure wiring scheme 

is correct.  Refer to Universal Wiring Matrix found at the end of this document. NOTE: Connectors not provided. 

STEP

 4

Snip ends of both the new endpoint cable and cable from the wall so that no wires are exposed past colored sleeves. Push  
wiring for each cable to the very back of gel cap. Used specialized Scotchlok pliers to make proper compression for gel cap 
connectors. 

STEP

 5

Confirm and make certain that gel caps 
are compressed correctly. Refer to    
Master Meter Activation Guide for AMR/
AMI configuration.  

Sleeves

Gel Caps

Reviews: