![Masspower SUN-1000GTIL2-LCD User Manual Download Page 13](http://html.mh-extra.com/html/masspower/sun-1000gtil2-lcd/sun-1000gtil2-lcd_user-manual_1736010013.webp)
4.3.9. Connect the GTIL power output to the LM AC receptacle using the
supplied cable. Turn on the disconnect switch/dc breaker of solar panel.
The wattmeter in the GTIL should power up and start producing power after a
minute or two.
4.3.10 Check the LM display. The utility power should display 0-15w indicating
the GTIL is already supplying power to the load. Check the inverter power display
in the LCD.
4.3.11 To shutdown, turn-off or unplug first the GTIL before disconnecting the
power to limiter module. Or shut off the breaker to LM module to cut power to
whole set-up. Do not disconnect Solar panel connection to GTIL while the system
is operating.
4.3.12 In normal operation, when the unit is started or the LM breaker is turned
on, while all the cables are connected and DC breaker is on, there will be about
2 minutes and 20seconds time delay before the GTIL unit will run. Always