
13
INSPECTIONS BEFORE EACH OPERATION
F or t h e pu r pose of k eepin g t h e br ea k er in good
con dit ion , m a k e su r e t h e followin g in spect ion it em s
a r e don e ea ch t im e befor e u sin g. (Refer t h e dr a win g
on t h e r igh t )
Inspection Items
Countermeasures
1. Loose nut
Tighten the loosen nut
2. Loose handle attachment
Tighten handle attachment
3. Loose hose attachment
Tighten hose attachment
4. Cracks on handle grips
Replace new one when cracks are found
5. Wears found on Drill Stay
Refer to the drawing on the right
MPL2Z005A0
Sound Power Level Sticker (103)
Summary of Contents for DH205
Page 10: ...10...
Page 22: ...22 EXPLODED VIEW MODEL DH205...