16
PERIODICAL INSPECTION
Ask your dealer for the periodical inspections.
Inspection Items
Operating Hours
Nitrogen gas charge in accumulator
300 hours or 1 Year
Replacement of accumulator diaphragm
500 hours or 2 years
Replacement of Valve Rod O ring
500 hours or 2 years
Replacement of U-cup packing
500 hours or 2 years
Replacement of each O ring
More than 3 years
INSTALLATION OF SIDE HANDEL
(1)
Place side handle on the flat part of front end of the breaker.
(2)
Set washers with bolts. Screw the bolts with torque 3.5kgf
・
m
(34.3N
・
m)
(3)
Make sure if side handle has been installed firmly.
TOOLS AND APPLICATIONS
Tools
Dimensions
Applications
Moil Point
Breaking
Concrete Chisel
Breaking
Asphalt Chisel
Cutting and Breaking
Shovel
Cutting and digging
out asphalt
Tamping Rammer
Compacting soil or
sand
L = 400mm
L = 400mm
L = 400mm
W = 76mm
L = 400mm
W = 140mm
L = 285mm
W= 180mm