TABLE OF CONTENTS 7A-i
Precautions ................................................
Precautions .......................................................
Precautions on HVAC ...................................... 7-1
Heater and Ventilation ...................................
General Description ...................................... 7A-1
Heater and Ventilation Construction ............. 7A-1
Schematic and Routing Diagram ................. 7A-2
Heater and Ventilation Wiring Circuit
Diagram ........................................................ 7A-2
Diagnostic Information and Procedures ....... 7A-2
Heater and Ventilation Symptom Diagnosis . 7A-2
Repair Instructions ....................................... 7A-3
HVAC Unit Components ............................... 7A-3
HVAC Unit Removal and Installation ............ 7A-3
Blower Motor Removal and Installation ........ 7A-4
Blower Motor Inspection ............................... 7A-4
Blower Motor Resistor Removal and
Installation .................................................... 7A-5
Blower Motor Resistor Inspection ................ 7A-5
Blower Motor Relay Inspection ................ .... 7A-5
HVAC Control Unit Components .................. 7A-6
HVAC Control Unit Removal and
Installation .................................................... 7A-6
Blower Speed Selector Inspection ............... 7A-8
Center Ventilation Louver Removal and
Installation .................................................... 7A-9
Side Ventilation Louver Removal and
Installation................................................ .... 7A-9
................. ................. 7B-1
Manual Type ................................................. 7B-1
Precautions ................................................... 7B-1
A/C System Caution.................................. ... 7B-1
Precautions on Servicing A/C System .... .... 7B-1
Refrigerant Type Identification ................. .... 7B-1
General Description .................................. ... 7B-2
Sub-Cool A/C System Description .... .......... 7B-3
A/C Operation Description ......................... . 7B-3
Schematic and Routing Diagram.............. ... 7B-4
Major Components of A/C System......... ...... 7B-4
A/C System Wiring Diagram ......................... 7B-5
Diagnostic Information and Procedures ....... 7B-6
Section 7
HVAC
CONTENTS
A/C System Symptom Diagnosis ................. 7B-6
Abnormal Noise Symptom Diagnosis
of A/C System ............................................... 7B-8
A/C System Performance Inspection ........... 7B-9
A/C System Inspection at ECM .................. 7B-15
Repair Instructions ......................................
Operation Procedure for Refrigerant
Charge ........................................................ 7B-17
Condenser Assembly On-Vehicle
Inspection ................................................... 7B-23
Condenser Assembly Removal and
Installation .................................................. 7B-24
Desiccant Removal and Installation ........... 7B-25
HVAC Unit Components ............................. 7B-26
HVAC Unit Removal and Installation ........ . 7B-27
Evaporator Inspection ................................. 7B-27
Evaporator Temperature Sensor Removal
and Installation ........................................... 7B-28
Evaporator Temperature Sensor
Inspection ................................................... 7B-28
Expansion Valve Removal and
Installation .................................................. 7B-29
Expansion Valve Inspection ........................ 7B-29
Dual Pressure Switch Inspection ............... 7B-29
A/C Switch Inspection ................................ 7B-30
Compressor Relay Inspection .................... 7B-31
Compressor Drive Belt Inspection and
Adjustment .................................................. 7B-31
Compressor Drive Belt Removal and
Installation .................................................. 7B-31
Compressor Assembly Removal and
Installation .................................................. 7B-32
Compressor Assembly Components .......... 7B-33
Magnet Clutch Inspection......................... .. 7B-33
Magnet Clutch Removal and Installation .... 7B-33
Thermal Switch Inspection ......................... 7B-36
Thermal Switch Removal and Installation .. 7B-37
Relief Valve Inspection.............................. . 7B-38
Specifications ..............................................
Tightening Torque Specifications ............... 7B-39
Summary of Contents for Zen Estilo 2018
Page 5: ......
Page 21: ......
Page 24: ...GENERAL INFORMATION 0A 3 ...
Page 47: ......
Page 51: ......
Page 57: ...1A 6 ENGINE GENERAL INFORMATION AND DIAGNOSIS ...
Page 58: ...ENGINE GENERAL INFORMATION AND DIAGNOSIS 1A 7 ...
Page 181: ...1D 50 ENGINE MECHANICAL Main Bearings Crankshaft and Cylinder Block Components ...
Page 192: ...ENGINE MECHANICAL 1D 61 REQUIRED SERVICE MATERIALS ...
Page 193: ...1D 62 ENGINE MECHANICAL ...
Page 239: ...1H 2 IGNITION SYSTEM Schematic and Routing Diagram Ignition System Wiring Circuit Diagram ...
Page 248: ...IGNITION SYSTEM 1H 11 Special Tools ...
Page 249: ......
Page 265: ...1J 4 CHARGING SYSTEM ...
Page 272: ...CHARGING SYSTEM 1J 11 Generator Component ...
Page 281: ......
Page 287: ......
Page 289: ......
Page 297: ...2B 2 FRONT SUSPENSION ...
Page 298: ...FRONT SUSPENSION 2B 3 ...
Page 315: ......
Page 335: ......
Page 347: ......
Page 348: ...FRONT DRIVE SHAFT 3A 1 Front Drive Shaft General Description Removal Installation ...
Page 349: ...3A 2 FRONT DRIVE SHAFT Disassembly Reassembly ...
Page 418: ...BRAKES WITH ABS 4A 11 f a b c d e a b a b c e f d 1 2 6 5 4 7 8 3 ...
Page 420: ...BRAKES WITH ABS 4A 13 ...
Page 447: ......
Page 450: ...ANTILOCK BRAKE SYSTEM 4B 3 System Schematic ...
Page 452: ...ANTILOCK BRAKE SYSTEM 4B 5 System Circuit ...
Page 485: ......
Page 487: ...2 5B MANUAL TRANSMISSION ...
Page 494: ...MANUAL TRANSMISSION 5B 9 Gear Shift Control Lever and Rod ...
Page 521: ...36 5B MANUAL TRANSMISSION Special Tools ...
Page 522: ...MANUAL TRANSMISSION 5B 37 ...
Page 523: ......
Page 536: ...ii 6 TABLE OF CONTENTS ...
Page 556: ......
Page 558: ...6C 2 ELECTRICAL POWER STERRING EPS SYSTEM ...
Page 578: ......
Page 594: ......
Page 596: ......
Page 608: ......
Page 613: ...AIR CONDITIONING SYSTEM 7B 5 A C System Wiring Diagram ...
Page 648: ......
Page 650: ......
Page 657: ...AIR BAG SYSTEM 8B 3 System Components and Wiring Location View and Connectors ...
Page 718: ......
Page 728: ......
Page 734: ......
Page 760: ......
Page 766: ......
Page 773: ...BODY STRUCTURE 9K 1 Front Bumper Rear Bumper Body Structure ...
Page 774: ...9K 2 BODY STRUCTURE Body Dimensions Unit in mm ...
Page 775: ...BODY STRUCTURE 9K 3 Unit in mm Unit in mm ...
Page 776: ...9K 4 BODY STRUCTURE Unit in mm Unit in mm ...
Page 777: ...BODY STRUCTURE 9K 5 Unit in mm Under Body Dimensions ...
Page 778: ...9K 6 BODY STRUCTURE Unit in mm ...
Page 780: ......
Page 783: ...PAINT COATINGS 9L 3 Sealant Application Area ...
Page 784: ...9L 4 PAINT COATINGS ...
Page 785: ...PAINT COATINGS 9L 5 ...
Page 786: ...9L 6 PAINT COATINGS ...
Page 788: ......