background image

5

Connect the L1, L2 and L3 test probes respectively to the L1, L2 and 

L3 phases of the voltage source. 

The PC15250 must indicate as shown below.

 

 

 

L1, L2 & L3 LED’s must illuminate red

 

 

  

 Phase Sequence L1 L2 L3 LED must 

illuminate red

 

 

  

 Phase Sequence LED L1 L3 L2 LED 

must be extinguished

L1

L2

L3

THREE LIT: CORRECT    

ONE LIT: THAT PHASE FAULTY

PHASE

PHASE SEQUENCE

L1

L2

L3

L1

L2

L3

Do not use the unit if the unit does not give the correct indications 

above.

During this verification emphasis should also be placed upon the 

flexing of the individual cables along their length, and particularly at 

the entry points to the hand held elements, to confirm that the cable/s 

have not fractured.

3.4 Testing a 3 Phase Distribution System

Take all required safety precautions when connecting the test probes 

to the 3-phase electrical distribution system to be tested. 

1.   The three test probes are marked L1, L2, L3. These relate to the 

L1, L2, L3 LED’s on the instrument facia.

2.  To determine phase presence and phase sequence, connect 

the test probes to the phase cables of the 3-phase electrical 

distribution system to be tested. Refer to table 2 of section 3.5 to 

determine to which cables to connect L1, L2 and L3 (see Note 2).

Summary of Contents for PC15250 Mk2

Page 1: ...PC15250 Mk2 PHASE SEQUENCE INDICATOR Instruction Manual...

Page 2: ...be paid to the Warnings Precautions and Technical Specifications Always check the unit is in good working order before use and that there are no signs of damage to it Do not use if damaged Where appli...

Page 3: ...troduction 1 1 1 Inspection 1 1 2 Description 1 1 3 Accessories 1 2 Product Specific Safety Information 2 2 1 Precautions 2 3 Operation 4 3 1 Description of LED Indicators 4 3 2 Use of Test Probe Shro...

Page 4: ...d to quickly and simply prove the presence of all three phases on a distribution system and indicate the phase sequence It is ideal for identifying worn or unmarked cables or ensuring motors etc are w...

Page 5: ...e following warnings and cautions before use Warning The phase sequence indicator must only be used by a skilled and competent person who is familiar with the relevant regulations the safety risks inv...

Page 6: ...t testing methods should be used to do this If the LED indicators do not illuminate this does not necessarily mean all three phases under test are dead Two phases could be open circuit but one phase c...

Page 7: ...from a location under test If desired and before the unit is connected to any source of voltage the shrouds can be locked back by pushing and twisting 90 The probe tips will be exposed by 3 0 5mm In...

Page 8: ...aced upon the flexing of the individual cables along their length and particularly at the entry points to the hand held elements to confirm that the cable s have not fractured 3 4 Testing a 3 Phase Di...

Page 9: ...ence LED will illuminate see Note 3 If a phase is missing then only the LED of the missing phase will illuminate The phase sequence LED s should be ignored when a phase is missing Warning Where a 3 ph...

Page 10: ...is L1 L3 L2 L1 L2 L3 THREE LIT CORRECT ONE LIT THAT PHASE FAULTY PHASE PHASE SEQUENCE L1 L2 L3 L1 L2 L3 L1 illuminates red Ignore phase sequence LED s Phase L1 is missing L1 L2 L3 THREE LIT CORRECT ON...

Page 11: ...ms the presence of live phases and the phase sequence in the location being tested E g A phase marked as L1 elsewhere in the fixed installation may not be the same phase as one marked as L1 in the loc...

Page 12: ...vents or detergents which can be conductive 4 3 Repair Service There are no user serviceable parts in this unit other than those that may be described in section 4 Return to Martindale Electric if fau...

Page 13: ...price free of charge repair or replacement of a defective product which is returned to Martindale within the warranty period This warranty is the buyer s sole and exclusive remedy and is in lieu of al...

Page 14: ...ther conditions only Altitude up to 2000m Temperature Operating Storage 10 C to 55 C Humidity Operating Storage 85 R H Pollution Degree 2 General Power from circuit under test Fuses 600V 0 5A 50kA HRC...

Page 15: ......

Page 16: ...n Testers Accessories Calibration Equipment Continuity Testers Electricians Kits Environmental Products Full Calibration Repair Service Fuse Finders Digital Clamp Meters Digital Multimeters Labels Mic...

Reviews: