u s e r m a n u a l
5
I n s t a l l p l u g o n p ow e r c o rd
W A R N I N G !
The fixture must be grounded (earthed).
7KHýIL[WXUHýPD\ýEHýGHOLYHUHGýZLWKRXWýDýSOXJýRQýWKHýSRZHUýFRUGïý$ýêðSURQJýJURXQGLQJð
W\SHýSOXJýPXVWýEHýLQVWDOOHGïý)ROORZLQJýWKHýPDQXIDFWXUHU©VýLQVWUXFWLRQVã
1. Connect the BROWN wire to the LIVE pin.
2. Connect the BLUE wire to the NEUTRAL pin.
3. Connect the YELLOW/GREEN wire to the GROUND (EARTH) pin.
I n s t a l l m o u n t i n g b r a ck e t
1. Place a plastic washer over each bracket stud.
2. Place the mounting bracket on the studs.
3. Screw a hand nut on each stud.
4. Tighten the hand nuts to lock the fixture.
R i g f i x t u r e
W A R N I N G !
Block access below the work area.
7KHýIL[WXUHýPD\ýEHýLQVWDOOHGýE\ýIDVWHQLQJýWKHýPRXQWLQJýEUDFNHWýGLUHFWO\ýWRýDýVWUXFWXUDO
VXSSRUWýRUýZLWKýDýULJJLQJýFODPSïý
1. If using a rigging clamp, bolt the clamp to the bracket with an M12 bolt and
lock nut through the 13 mm hole in the mounting bracket.
2. If fastening the bracket directly to the structure, make sure that the attach-
ment hardware (not included) can hold 10 times the weight of the fixture.
The four 6 mm holes and the 13 mm hole in the mounting bracket may be used.
3. Verify that the structure can support at least 10 times the weight of all
installed fixtures, clamps, cables, auxiliary equipment, etc.
4. Working from a stable platform, fasten the fixture to the structure.
5. Install a safety cable that can hold at least 10 times the weight of the fixture
through/over the support and through the mounting bracket.
6. Loosen the locks on both sides of the bracket and tilt the fixture to the
desired angle. Tighten the tilt locks.