DRYWALL TAPER
ENCINTADORA DE PANELES DE YESO
DEVIDOIR DE RUBAN POUR CLOISON SECHE
®
RIGHT/ DERECHA/ DROIT : 798D EDI 16375
LEFT/ IZQUIERDA/ GAUCHE : 799D EDI 16376
Mud compartment door
Cubierta del compartimiento de la pasta
Volet du compartiment a enduit
Tape spool gate latch
Pestillo de la cubierta del portarollo de la cinta
Verrou de fermeture de la bobine
Tape spool holder
Sujetador del portarollo de la cinta
Support de bobine
Mud compartment door latch
Pestillo de la cubierta del compartimiento de la pasta
Verrou du volet de compartiment a enduit
Cutoff blade fasteners
Sujetadores de la cuchilla de corte
Vis de fixation de la lame
Cutoff blade
Cuchilla de corte
Lame du Couteau
Front slot
Acanalado delantero
Fente avant
Flow adjuster
Ajustador del flujo
Reglage de debit
COMPOUND
PASTA
COMPOSE
Fig 1.
Ilustracion 1
Fig. 1
ASSEMBLY
ENSAMBLADO
ASSEMBLAGE
OPERATING INSTRUCTIONS:
1. Point TapeShooter upright.
2. Briskly swing front slot towards floor to get mud flow started.
3. Pull out 6” of tape.
4. Place tape at origin of seam and hold it in position with a 6 or 8”
taping knife.
5. Keep TapeShooter 6” above seam and pull out 10 to 12” of tape.
6. Slide taping knife down over tape to new holding point.
7. Repeat pulling and sliding actions until end of seam is reached.
8. At end, hold tape firmly while pulling through front slot across cutoff
blade, then push cutoff blade against tape to cut tape.
9. Use taping knife to flatten tape and remove excess mud from seam.
10. Remove excess mud from taping knife and place in mud pan.
11. When seams are dry, apply fill coat followed by thin blending coat and
sand lightly.
LOADING INSTRUCTIONS
(Use a 250 - 500’ long, 2” wide roll of tape)
1. With a mud compartment door facing up, lay TapeShooter on side.
2. Release tape spool gate latch to access tape spool holder.
3. Pull tape spool holder up.
4. Place roll of tape on tape spool, unreeling in clockwise direction.
5. Hand feed tape into rear slot of mud compartment, threading 8 to 12”.
6. Close tape spool gate and re-latch.
7. Release mud compartment door latch and pull door open
8. Find tape leader and pass tape through front slot of mud compartment, extending tape
6” beyond cutoff blade.
9. Turn flow adjuster clockwise until metering blade almost closes the front slot
10. In order for tape to skim across surface of mud, mold tape from bottom to top and
along sides of mud compartment (see fig. 1).
11. Pour mud mixed to manufacturer’s instructions into mud compartment, close door and
re-latch.
12. Pull out a few inches of tape from front slot to check amount of mud on tape.
13. To change mud flow, turn flow adjuster counter clockwise for more.
TAPESHOOTER REPLACEMENT BLADES AVAILABLE
798 Replacement Cutoff Blade (right handed) - RB799, EDI 16457 - packaged 1 per bag
799D Replacement Cutoff Blade (left handed) - RB799, EDI 16458 - packaged 1 per bag
TapeShooter Features:
• ”Integral design“ compartment hinge
• Available left or right handed
• Easy to adjust precision mud flow control
• Adjustable web side handle
• Latched gate on tape spool holder
• One hand mud loading
• Lightweight aluminum handle®
• Comfortable DuraSoftFeatures:® TapeShooter
Marshalltown, IA USA• Phone 800-888-0127 • 614-753-0127 • www.
MARSHALLTOWN.
com
WS960
Printed in USA • Impreso en EUA W • Imprimé aux É.-U.