5 of 10
104 S. 8th Ave. Marshalltown, IA Phone 800-888-0127 / 641-753-0127 • Fax 800-477-6341 / 641-753-6341 www.MARSHALLTOWN.com
WS2860
ASSEMBLY GUIDE
1. Lay out all the components of the Spin Screed® Assembly.
Note: Pipe sold separately
2. Attach handle bar (A) to end of shaft using (2x) 5/16"-18 UNC x 2" LONG HHCS, washers and nuts (included). Prior to
tightening the handle bar on the end of the shaft, select right- or left-handed throttle lever position by flipping handle
bar over and adjust the balance of the handle bar (left to right) to achieve best handling for the specific application.
3. Attach both parts of the Dead-End T-Handle (D) and screw in the handle components (E).
(Note: It is best to have the hole at the end perpendicular to the T-Handle)
4. Take the Small Tool (F) from the Handle (A). Remove the power axle from Live End (J) by depressing the spring with
the Small Tool. Return the Small Tool to the Handle.
5.
NOTE: Ends (I&J) must be installed in screed pipe before these steps. See next page.
Connect the Power Head
(B) by depressing the locking pin on the power axle which is installed in the Live End (J). Insert the square drive lug on
the power axle into the Live End (J) pivot coupling. Check to assure the catch pin has popped into the pivot coupling by
trying to pull it away from the Power Head.
6. For safety, cover the exposed axle (the side not being used) with the Safety Boot (C) and attach to the gearbox with
hardware provided.
7. Connect the T-Handle (D) to the Dead End (I) by removing the pin (H), placing the T-Handle through the opening and
replacing the pin.
B
A
K
C
J
I
H
E
D
D
Hole on end
E
Pipe Sold Separately — Several Available Lengths
F