1.1 Preface

Please read and follow this operating manual in order to achieve a long service life of the
unit. Please follow the installation manual when installing and commissioning the unit. The
product has been tested at our works. This means that it has been delivered free from
defects. However, in case of a failure during operation, please see chapter 2.6.

1.2 Warranty (excerpt)

The warranty period is 24 months from the date of purchase of the product.
Within the guarantee period, we will eliminate functional faults free of charge which are
due to manufacture or material defects. These are failures which occur despite proper
connection, proper handling and due consideration given to the operating and installation
manual.

„Please see the valid warranty regulations in our current general Terms & Conditions“.

1.3 General notes

This unit has to be installed in accordance with the technical guidelines
such e.g. BS EN 1717!

• The user is responsible for the following actions:

- of proper installation
- To avoid risks due to improper operation.

• The  unit  has  been designed solely for use:

- at 230 V, 50 Hz AC voltage,
- in rain water harvesting systems,
- for  mains water supply to the storage tank,
- up to a water temperature of 35° C,
- In the vicinity of residential, trade and industrial areas as well as small

sized  companies.

• The following kinds of operation are prohibited::

- the pumping of polluted or contaminated sewage water,
- the  pumping of water with acid content, as well as generally corrosive

liquids,

- the  pumping of water with a temperature higher than 35° C.
- the pumping of flammable and / or explosive media,
- Installation in frost-prone environment
- the operation in a dry state.

Summary of Contents for Rain Cell

Page 1: ...cations 01 06 2015 This document must be read prior to installation Follow all safety notes Keep in a safe place for future use This installation and operation manual contains important notes and warn...

Page 2: ...lease see the valid warranty regulations in our current general Terms Conditions 1 3 General notes This unit has to be installed in accordance with the technical guidelines such e g BS EN 1717 The use...

Page 3: ...an earth leakage circuit breaker 30 mA The user may not tamper on their own initiative with any parts or systems in any way which is not called for in the operating and installation instructions No f...

Page 4: ...t a constant gradient of 1 and there are no vertical rises On a level floor to avoid distortion within the unit In a room with drainage point in the floor Vertical to prevent malfunctions 1 8 Mounting...

Page 5: ...d inlet 1 10 Connection of emergency overflow A 40mm pipe has to be connected to overflows of the funnel The overflow has to be connected to the outgoing drainage or to the pumping station Make sure t...

Page 6: ...ersible pump in the storage tank Connect the pressure pipe leak tight and tightly with the pressure inlet of the unit see fig 4 Connect the pressure outlet of the unit with the existing pressure pipe...

Page 7: ...water pipe can be shut off in the case of a longer absence Connect the mains water pipe tightly to the connection of the solenoid valve The first pipe clip has to be installed with a maximum distance...

Page 8: ...be watertight The storage tank must be filled with water so far that the submersible pump is completely covered otherwise top up storage tank Make sure that the unit is disconnected from the power sup...

Page 9: ...the mains and plug the pump pump control in the socket of the connection box The submersible pump has run dry and turned off Check the storage tank and the float switch Check the pressure line and su...

Page 10: ...Personal training and qualification The personnel involved in the operation maintenance inspection and assembly must be suitably qualified for this work The owner must regulate the responsibilities c...

Page 11: ...IEC 364 VDE 0100 i e the sockets must be provided with earthing terminals The electrical mains for the connection of the unit must be provided with a residual current circuit breaker in accordance wi...

Page 12: ...014 1 EN 55014 2 EN 60204 1 Applied national norms DIN 1988 Part 4 BS EN 1717 The following operating conditions and environments of use shall be required The unit has been designed to control regulat...

Reviews: