Installation Manual -
A-VMH18DV,28TV,36QV,48PV-1
9
Installation Diagram
4
Installation Diagram
Installation
plate
Mounting screw
ST3.9
×
25-C-H
Refrigerant
pipe
Remote
controller
holder
Clip anchor
(2)
1
2
3
5
4
1
Installation plate
Clip anchor
(1)
Remote
controller
holder
5 4 3
2
The maximum
amount of the
connection cables is 5.
This section is for
reference only.
Air-break Switch
Drainage
Pipe
Air-break
Switch
Outdoor Unit
Power Cable
Minimum - 3"
Minimum - 3"
More
than 5"
Minimum - 3"
Minimum - 3"
24"
12"
80"
Minimum - 4"
Recommended -12"
Minimum -
2
4"
Minimum - 3"
5"
5"
24"
12"
Minimum - 4"
Recommended - 12"
Minimum -
2
4"
80"
NOTE:
•
The installation must be performed
in
accordance with local and national
standards. Standards may vary in
different areas.
•
A minimum pipe run of 3
meters
is
required to minimize vibration &
excessive noise.
•
Two of the
B
,
C
, and
D
air circulation
pathways must be free from obstructions
at all times.
(A)
(B)
(E)
(D)
(C)
A
Recommended for Service Access: 12”
B
24” Minimum on right
C
79” in front
D
12” on left
E
24” above
Refer to the following diagram to ensure
proper distance from walls and ceiling:
Minimum clearance - 64”
0"
M
Miinniim
muum
m cclleeaarraannccee -- 33""
RReeccoom
meennddeedd cclleeaarraannccee -- 66""
0"
Installation Manual -
A-VMH18DV,28TV,36QV,48PV-1
9
Installation Diagram
4
Installation Diagram
Installation
plate
Mounting screw
ST3.9
×
25-C-H
Refrigerant
pipe
Remote
controller
holder
Clip anchor
(2)
1
2
3
5
4
1
Installation plate
Clip anchor
(1)
Remote
controller
holder
5 4 3
2
The maximum
amount of the
connection cables is 5.
This section is for
reference only.
Air-break Switch
Drainage
Pipe
Air-break
Switch
Outdoor Unit
Power Cable
Minimum - 3"
Minimum - 3"
More
than 5"
Minimum - 3"
Minimum - 3"
24"
12"
80"
Minimum - 4"
Recommended -12"
Minimum -
2
4"
Minimum - 3"
5"
5"
24"
12"
Minimum - 4"
Recommended - 12"
Minimum -
2
4"
80"
NOTE:
•
The installation must be performed
in
accordance with local and national
standards. Standards may vary in
different areas.
•
A minimum pipe run of 3
meters
is
required to minimize vibration &
excessive noise.
•
Two of the
B
,
C
, and
D
air circulation
pathways must be free from obstructions
at all times.