27
Pass one end of the thread through the lug at the end of the riser end and bind it
with the second thread end using three nodes. Excess lengths of the threads are
cut at distance 15 to 20 mm from the nodes (fig. 21).
The same task is performed for the second riser.
Fig. 21
Within compliant distance from the risers, pass the lines through the rubber bands
at the container bottom (fig. 22a).
Loose ends of the packaging flap are open and used for covering the risers
connection with the container (fig. 22b).
a)
b)
Fig. 22
Summary of Contents for ATL-15
Page 2: ...2...
Page 4: ...4...
Page 20: ...20 Fig 11 Fig 12...
Page 25: ...25 Fig 18 a b c d e...
Page 38: ...38...
Page 39: ...39 The label completion and marking of the emergency parachute ATL 88 90 1A ATL 15...