Marquis Solara MQZDV3318 Installation Instructions Manual Download Page 11

It is recommended for 

Propane Horizontal Installations

that the venting should be a minimum of one foot vertical off the flue

before the elbow on any horizontal runs of one foot or greater.  This allows for cleaner combustion and greatly reduces carboning
and cleaning of glass. 

MQZDV3622 - Framing for your Gas Fireplace

MQZDV3622 Louvered

MQZDV3622 WITH CVCK (CLEAN VIEW CIRCULATING KIT)

4. When installing horizontal with a 90 degree bend maintain a minimum

of two and a half (2.5”) inches above the bend in enclosures.

5. For a fireplace with louvers combustible floor can raise 1”

above the bottom of the fireplace. For a fireplace with
36CVCK (Clean view Circulating Kit) floor or hearth can raise
7” above the bottom of the  fireplace with portions being com-
bustible and non combustible. See drawing on following page.

6. When installing MQ36SWF surround, the fireplace must be

raised a minimum of 2 1/2” above the finished floors, to
accommodate the wall surround. The fireplace may be raised
higher but the 60” clearance measured from the bottom of the
fireplace to the ceiling must be maintained at all times. (i.e.
For an 8 ft. ceiling the unit can be raised only 36 inches.)

Framing Specifications

1. Cold climate installation recommendation: When installing this fire-

place against non insulated exterior wall or chase, it is recom -
mended that the outer walls be insulated to conform to applicable
insulation codes. Drywall must be installed over insulation to  prevent
contact of insulation and unit.

2. Choose fireplace location and frame in accordance with the fireplace

framing dimensions specified (See Framing Diagrams). Bend nailing
tabs forward on left and right of unit and place fireplace into framed
enclosure. This allows for 1/2” in front of framing tabs for finishing
materials.

3. Drywall or other material can extend flush with the appliance on the

bottom, sides and top of fireplace. (louvered models only)

11

Summary of Contents for Solara MQZDV3318

Page 1: ...try to light any appliance Extinguish any open flame Do not touch any electrical switch Do not use any phone in your building Immediately call your gas supplier from a neighbour s phone If you can no...

Page 2: ...sed with the installations e g marble tile and the adhesives used to adhere this product to the walls can react with heat and cause odours It is recommended that you burn your gas fireplace or stove f...

Page 3: ...allation 18 Split Receptacle Fan Speed Control Outside of Fireplace 19 Z3318 Z3622PRL Z3318ML Z3622ML Installation Guide 20 3318 3622 Door and Glass Information 21 Gas Line Installation 22 Burner Syst...

Page 4: ...LLED IN MANUFACTURED MOBILE HOMES IN CANADA Please follow the current ANSI NFPA 70 National Electrical Code in the USA and CAN CSA C22 1 Canadian National Electrical Code in Canada An appliance must b...

Page 5: ...the appliance 15 Installation and repair should be done by a qualified service person The appliance should be inspected before use and at least annually by a professional service person More frequent...

Page 6: ...A 720 2005 Edition B A carbon monoxide detector shall be located in the room that houses the appliance or equipment and shall Be powered by the same electrical circuit as the appliance or equipment su...

Page 7: ...installation with a top vent is possible as long as the horizon tal portion of the vent system does not exceed 20 feet 6 1 m A Flat on a wall D As a room divider B Across the corner E Flat on wall cor...

Page 8: ...t be raised a minimum of 2 7 8 above the finished floors to accommodate the wall surround The fireplace may be raised higher but the 60 clearance measured from the bottom of the fireplace to the ceili...

Page 9: ...Z33CVCK Framing and Facing Requirements MQZDV3318 WITH Z33CVCK CLEAN VIEW CIRCULATING KIT Z33CVCK with Wall Surround 9...

Page 10: ...installation with a top vent is possible as long as the horizon tal portion of the vent system does not exceed 20 feet 6 1 m A Flat on a wall D As a room divider B Across the corner E Flat on wall cor...

Page 11: ...fireplace must be raised a minimum of 2 1 2 above the finished floors to accommodate the wall surround The fireplace may be raised higher but the 60 clearance measured from the bottom of the fireplace...

Page 12: ...Z36CVCK Framing and Facing Requirements MQZDV3622 WITH Z36CVCK CLEAN VIEW CIRCULATING KIT Z36CVCK with Wall Surround 12...

Page 13: ...lied screws FIG 1 For ZDV6000 ZDV3320 MQRB3328 models use the larger 8 standoffs On the ZDV3318 unit remove the large 8 standoffs 3 Hang CVCK on top of fireplace retainer tabs and rotate down into pos...

Page 14: ...DV3318 3622 Mantels Surrounds Warning Combustible objects must not be placed on a non combustible mantel unless the non combustible mantel meets the minimum height and width requirements for a combust...

Page 15: ...r over the front face of the fireplace NO PORTION OF GRILL AREA OR DOOR AREAS CAN BE COVERED except where designer clean view kit is used Combustible material can extend flush to unit up to the top bo...

Page 16: ...e For units with CVCK Clear View Circulating Kit see framing with CVCK to establish floor heights MQZDV3622 Clearance to Combustibles Clearance to Combustibles Back from Standoffs 0 inches 0 mm Side f...

Page 17: ...3 4 8 3 4 H 1 1 I 1 3 16 1 3 16 1 Set Surround Lip on CVCK Ledge and ensure that it is securely in place 2 Swing the upper portion of the Surround so that the Surround Ledge is resting on top of the...

Page 18: ...the unit reaches operating temperature approximately 10 to 15 minutes the fan will turn on The fan can be switched off if desired by turning the wall switch fully counter clockwise 5 To set the minim...

Page 19: ...pronged grounding plug for your protection against shock hazard and should be plugged directly into a properly grounded three prong receptacle Label all wires prior to disconnection when servicing con...

Page 20: ...hile placing the bottom edge over the front ledge of the firebox Then rotate the panel upright and slide it back towards the rear liner panel Make sure the top of the side panel is engaged with the to...

Page 21: ...aution when removing broken glass wear gloves Removal of the Glass Door ZDV3318 MQZDV3318 1 Unlatch the two latches located behind the upper grill 2 To remove pull frame forward and lift from bottom d...

Page 22: ...system during any pressure testing of that system at test pressures in excess of 1 2 PSIG 3 5 KPa 9 The appliance must be isolated from the gas supply piping system by closing its individual shutoff...

Page 23: ...e of gas valve 4 Remove screws from perimeter of burner system pan Lift pan at one back corner and rotate pan up from back of firebox Make sure when tilting up and removing burner system that all fan...

Page 24: ...hand push in the red ignitor button until you hear a click Now observe closely the pilot burner located on the rear center left hand side of the main burner If a flame has appeared then continue to de...

Page 25: ...Flame should appear similar to the above picture Conversion Kit Instructions PART A Kit Number Description Pilot Orifice Burner Orifice Brass 1000 255 Brass Nipple Air Shutter Hi Lo Regulator 3318 CK...

Page 26: ...w 7 After converting parts to the new type of gas reverse all steps to reassemble burner system IMPORTANT Always check for gas leaks with a soap and water solution DO NOT USE OPEN FLAME FOR LEAK TESTI...

Page 27: ...e new injector is proper for the application The injector size is stamped on the side of the injector near the top LPG injectors have a groove machined around their circumference near the top while NG...

Page 28: ...Gas Conversion for Modulator PART C WARNING WARNING 28...

Page 29: ...the remote Contrary to this feature is a Manual HI LO Control Knob The Modulating Servo Motor requires the Remote system to be present Backup Battery Pack This component permits the IPI system to oper...

Page 30: ...ol wiring harness instead of the main IPI harness From the Remote wiring harness use its male plug in connector and connect it to the female plug in in the main IPI harness Now the circuit is complete...

Page 31: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 31...

Page 32: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 32...

Page 33: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 33...

Page 34: ...ent LIGHTING INSTRUCTIONS 1 STOP Read the above safety information on this label 2 Remove batteries from Receiver and or Battery Backup Pack 3 Turn off all electric power to the fireplace 4 This firep...

Page 35: ...witch If okay jumper wires across wall switch wires at valve If burner comes on wires are faulty or connec tions are bad Generator may not be generating Check generator with millivolt meter Take readi...

Page 36: ...rock wool on burner as shown in step 1 being sure to leave the multiple porting areas open For Lp only the multiple porting areas can be completely covered Do not cover the Rear Porting areas with ro...

Page 37: ...EP 4 Place Log 4 into place as shown Do Not place directly over top of the multiple porting area on the left side STEP 5 Fill in the rest of the burner pan and ember plates with lava rock and vermicul...

Page 38: ...the 2 ember plates once the grate bar is removed The 2 screws removed must be re installed once the grate bar is removed Step 3 Using the left ember plate mounting bracket slide the left ember plate...

Page 39: ...that they are crossing over the single line porting MQRSP5 finished setup and burn Step 8 Place rock 3 and rock 1 into position as shown to complete the setup Lava rock and vermiculite are optional f...

Page 40: ...requirements check local codes NOTE Clearances are to the edge of terminal plate add 6 3 4 to clearances to arrive at center line NOTE Local Codes or Regulations may require different clearances Term...

Page 41: ...each pipe at fireplace termination and any joint if joining any sections of pipe OPTIONAL CLAMPS SEAL WITH HIGH TEMP SEALANT WARNING DO NOT mix parts from different systems unless stated in the manual...

Page 42: ...ht of the system and the number of bends required 2 Having determined the vertical distance determine the maxi mum horizontal section allowed 3 Vent table has been established for 90 horizontal vertic...

Page 43: ...two rulers or by using a roof pitch card See figure below Slide a Roof Flashing suitable to your roof slope over the vent Place the edge of the flashing plate that will be on the higher part of the r...

Page 44: ...INTAKE ADJUSTMENT PLATE NOTE Unit comes preset for short horizontal or vertical venting under a 15 feet run Follow these instructions when venting exceeds 15 foot run 1 Locate the 3 x 1 4 hex screws a...

Page 45: ...Black 352 Z33ADTH Arch Door Frame Top Half Black 353T Fan Kit Blower Z33FK Fan Kit w Variable Speed Wall Mount Control Temperature Sensing 6000 P930 Blower Motor QLN657 1800 Z33FK MOTOR ZDV3318 Parts...

Page 46: ...Frame Top Half Black 353T Fan Kit Blower Z36FK Fan Kit w Variable Speed Wall Mount Control Temperature Sensing 6000 081 Blower Motor QLN657 1800 Z36FK MOTOR Refractory Liners Z3622PRL Porcelain Refle...

Page 47: ...00 150MP Hi Temp Millpac Sealant 840099 1000 214 Piezo Igniter 1244 17 MARK 21 1000 215 Pal Nut 18MMXI 5MM BLK 1364 03 1000 218 Switch Ivory 1451 001 1000 227 Cover Ivory 86001 001 1000 255 Orifice Br...

Page 48: ...and other at risk individuals out of the room and away from hot surfaces Do not leave the fireplace remote control where it is accessible to children Termination Cap Safety All Units WARNING WHEN THE...

Page 49: ...service or maintenance h damage repairs inoperation or inefficiency resulting from faulty installation or application i electricity or fuel costs or any increase in electricity or fuel cost whatsoever...

Reviews: